• Make Safe Demo Only physical removal and disposal of demolished items by others.
• Master Label Lightning Protection Certification included.
• Provide and Install Supports, conduits, conductors, and connections for VFD’s.
• VFD’s 1, 3, and 4 are provided by Mechanical contractor.
• Provide and install One (1) 30 amp 3R disconnect for cooling tower.
• Provide and install conduit, conductors, and connections for pumps 3 and 4.
• Provide and install One (1) 30 amp 3 pole Breaker.
• Provide and install Two (2) 20 amp 3 pole Breakers.
• Provide and install conduit, conductors, and connections for cooling tower and control panel.
• …show more content…
• Bond costs are not included.
• This proposal is based on T.P Electric Inc.’s interpretation of the plans and specifications as stated above and subject to correction for errors in such plans or specifications.
• T.P Electric Inc. shall not implement any changes in this scope of work unless Owner/ General Contractor and T.P Electric agree in writing to the details of the change and any resulting price, schedule or other contractual modifications.
• TP Electric is Bidding the buildings only (No Site Work Allowed