Develop Project Charter: INPUTS:
|
Develop Project Charter: INPUTS:
Process Area: Initiating Knowledge Area: Integrating 1. Contract 2. SOW (includes business need, scope description, strategic plan) 3. EEF 4. OPA (templates, procedures) |
|
Develop Project Charter: TOOLS:
|
Develop Project Charter: TOOLS:
1. Project Selection Methods 2. Project Management Methodology 3. PMIS 4. Expert Judgement |
|
Develop Project Charter: OUTPUTS:
|
Develop Project Charter: OUTPUTS:
1. Project Charter |
|
Develop Preliminary Project Scope Statement INPUTS:
|
Develop Preliminary Project Scope Statement INPUTS:
Knowledge Area: Scope Process Group: Initiating 1. Project Charter 2. SOW 3. EEF 4. OPA |
|
Develop Preliminary Project Scope Statement TOOLS:
|
Develop Preliminary Project Scope Statement TOOLS:
1. PMM 2. PMIS 3. EJ |
|
Develop Preliminary Project Scope Statement OUTPUTS:
|
Develop Preliminary Project Scope Statement OUTPUTS:
OUTPUTS: 1. Prelimnary Project Scope Statement Create WBS INPUTS 1. OPA 2. Project Scope Statement 3. Project Management Plan 4. Approved change requests |
|
Develop Project Mangement Plan - INPUTS
|
Develop Project Mangement Plan - INPUTS
Process: Planning Knowledge: Integration 1. Preliminary project scope statement 2. Project management processes 3. EEF 4. OPA |
|
Develop Project Mangement Plan - TOOLS
|
Develop Project Mangement Plan - TOOLS
1. PMM 2. PMIS 3. EJ |
|
Develop Project Mangement Plan - OUTPUTS
|
Develop Project Mangement Plan - OUTPUTS
1. Project management plan |
|
Scope Planning - INPUTS
|
Scope Planning - INPUTS
Process: Planning Knowledge: Scope 1. EEF 2. OPA 3. Project Charter 4. Preliminary Project Scope Statement 5. Project Management Plan |
|
Scope Planning - TOOLS
|
Scope Planning - TOOLS
1. EJ 2. Templates, Forms, Standards |
|
Scope Planning - OUTPUTS
|
Scope Planning - OUTPUTS
1. Project Scope Management Plan |
|
Scope Definition - INPUTS
|
Scope Definition - INPUTS
Process: Planning Knowledge: Scope 1. OPA 2. Project Charter 3. Preliminary Project Scope Statement 4. Project scope Management Plan 5. Approved change requests |
|
Scope Definition - TOOLS
|
Scope Definition - TOOLS
1. Product Analysis 2. Alternatives identification 3. Expert judgment 4. Stakeholder analysis |
|
Scope Definition - OUTPUTS
|
Scope Definition - OUTPUTS
1. Project Scope Statement 2. Requested Changes 3. Project scope management plan (updates) |
|
Create WBS - INPUTS
|
Create WBS - INPUTS
1. OPA 2. Project Scope Statement 3. Project Management Plan 4. Approved change requests |
|
Create WBS - TOOLS
|
Create WBS - TOOLS
1. Work breakdown structure templates 2. Decomposition |
|
Create WBS - OUTPUTS
|
Create WBS - OUTPUTS
1. Project Scope Statement (updates) 2. WBS 3. WBS dicitionary 4. Scope Baseline 5. Project Scope Management Plan (updates) 6. Requested changes |
|
Activity Definition - INPUTS
|
Activity Definition - INPUTS
Process: Planning Knowledge: Time 1. EEF 2. OPA 3. Project Scope Statement 4. WBS 5. WBS Dictionary 6. Project management plan |
|
Activity Definition - TOOLS
|
Activity Definition TOOLS
1. Decomposition 2. Templates 3. Rolling Wave Planning 4. Planning component 5. Control account 6. Planning package |
|
Activity Definition - OUTPUTS
|
Activity Definition - OUTPUTS
1. Activity list 2. Activity attributes 3. Milestone list 4. Requested changes |
|
Activity Sequencing - INPUTS
|
Activity Sequencing - INPUTS
Process: Planning Knowledge: Time 1. Project scope statement 2. Activity list 3. Activity attributes 4. Milestone list 5. Approved change requests |
|
Activity Sequencing - TOOLS
|
Activity Sequencing - TOOLS
1. Precedence Diagramming Method (PDM) 2. Arrow diagramming method 3. schedule network templates 4. dependency determination 5. Applying lags and leads |
|
Activity Sequencing - OUTPUTS
|
Activity Sequencing - OUTPUTS
1. Project schedule network diagrams. 2. Activity list (updates) 3. Activity attributes (updates) 4. Requested changes |
|
Activity Resource Estimating - INPUTS
|
Activity Resource Estimating - INPUTS
Process: Planning Knowledge: Time EEF OPA Activity list Activity attributes Resource availability PMP |
|
Activity Resource Estimating - TOOLS
|
Activity Resource Estimating - TOOLS
1. EJ 2. Alternatives analysis 3. Published estimating data 4. Project management software 5. Bottom-up estimating |
|
Activity Resource Estimating - OUTPUTS
|
Activity Resource Estimating - OUTPUTS
1. Activity resource requirements 2. Activity attributes (updates) 3. Resource breakdown structure 4. Resource calendars (updates) 5. Requested changes |
|
Activity Duration Estimating - INPUTS
|
Activity Duration Estimating - INPUTS
Process: Planning Knowldege: Time 1. EEF 2. OPA 3. Project scope statement 4. Activity list 5. Activity attributes 6. Resource calendars 7. Project management plan |
|
Activity Duration Estimating - TOOLS
|
Activity Duration Estimating - TOOLS
1. Expert Judgment 2. Analogous estimating 3. Parametric estimating 4. Three-point estimates 5. Reserve analysis |
|
Activity Duration Estimating - OUTPUTS
|
Activity Duration Estimating - OUTPUTS
1. Activity duration estimation 2. Activity attributes (updates) |
|
Schedule Development - INPUTS
|
Schedule Development - INPUTS
Process: Planning Knowledge: Time 1. OPA 2. Project scope statement 3. Activity list 4. Activity attributes 5. Project schedule network diagrams 6. Activity resource requirements 7. Resource calendars 8. Activity duration estimates 9. Project management plan (risk register) |
|
Schedule Development - TOOLS
|
Schedule Development - TOOLS
1. Schedule network analysis 2. Critical path method 3. Schedule compression 4. What-if scenario analysis 5. Resource leveling 6. Critical chain method 7. Project management software 8. Schedule model 9. Apply calendars 10. Adjust leads and lags |
|
Schedule Development - OUTPUTS
|
Schedule Development - OUTPUTS
1. Project schedule 2. Schedule model data 3. Schedule baseline 4. Resource requirements (updates) 5. Activity attributes (updates) 6. Project calendar (updates) 7. Requested changes 8. Project management plan (updates, including schedule management plan) |
|
Cost Estimating - INPUTS
|
Cost Estimating - INPUTS
Process: Planning Knowledge: Cost 1. EEF 2. OPA 3. Project scope statement 4. WBS 5. WBS dictionary 6. Project management plan (schedule & staffing mgmt plan, risk register) |
|
Cost Estimating - TOOLS
|
Cost Estimating - TOOLS
1. Analogous estimating 2. Determine resource cost rates 3. Bottom-up estimating 4. Parametric estimating 5. PMS 6. Vendor bid analysis 7. Reserve analysis 8. Cost of quality |
|
Cost Estimating - OUTPUTS
|
Cost Estimating - OUTPUTS
1. Activity cost estimates 2. Activity cost estimate supporting detail (description, basis of estimate, constraint, ROM) 3. Requested changes 4. Cost management plan (updates) |
|
Cost Budgeting - INPUTS
|
Cost Budgeting - INPUTS
Process: Planning Knowledge: Cost 1. Project Scope Statement 2. WBS 3. WBS Dictionary 4. Activity cost estimates 5. Activity cost estimate supporting detail 6. Project schedule 7. Resource calendars 8. Contract 9. Cost management plan |
|
Cost Budgeting - TOOLS
|
Cost Budgeting - TOOLS
1. Cost aggregation 2. Reserve analysis 3. Parametric estimating 4. Funding limit reconciliation |
|
Cost Budgeting - OUTPUTS
|
Cost Budgeting - OUTPUTS
1. Cost baseline 2. Project funding requriements 3. Cost management plan (updates) 4. Requested changes |
|
Quality Planning - INPUTS
|
Quality Planning - INPUTS
Process: Planning Knowledge: Quality 1. EEF 2. OPA 3. Project scope statement 4. Project management plan |
|
Quality Planning - TOOLS
|
Quality Planning - TOOLS
1. Cost/benefit analysis 2. Benchmarking 3. Design of experiments 4. Cost of quality 5. Additional quality planning tools |
|
Quality Planning - OUTPUTS
|
Quality Planning - OUTPUTS
1. Quality management plan 2. Quality metrics 3. Quality checklists 4. Process improvement plan(steps to analyze processes to identify waste & non-value added items) 5. Quality baseline 6. Project management plan (updates) |
|
Human Resource Planning - INPUTS
|
Human Resource Planning - INPUTS
Process: Planning Knowledge: HR 1. EEF (organizational, technical, interpersonal, logistical, political) 2. OPA (templates, checklists) 3. Project management plan(activity resource requirements) |
|
Human Resource Planning - TOOLS
|
Human Resource Planning - TOOLS
1. Organizational charts and position descriptions 2. Networking 3. Organizational Theory |
|
Human Resource Planning - OUTPUTS
|
Human Resource Planning - OUTPUTS
1. Roles and responsibilities (role, authority, responsibility, competencies required) 2. Project organization charts 3. Staffing management plan |
|
Communications Planning - INPUTS
|
Communications Planning INPUTS
Process: Planning Knowledge: Communications 1. EEF 2. OPA 3. Project scope statement 4. Project management plan |
|
Communications Planning - TOOLS
|
Communications Planning - TOOLS
1. Communications requirements analysis 2. Communications technology |
|
Communications Planning - OUTPUTS
|
Communications Planning - OUTPUTS
1. Communication management plan [provides: (i)stakeholder requirements (ii)info to be communicated (iii)responsibility (iv)methods (v) escalation vi)updating] |
|
Risk Management Planning - INPUTS
|
Risk Management Planning - INPUTS
Process: Planning Knowledge: Risk 1. EEF 2. OPA 3. Project scope statement 4. Project management plan |
|
Risk Management Planning - TOOLS
|
Risk Management Planning - TOOLS
1. Planning meetings |
|
Risk Management Planning - OUTPUTS
|
Risk Management Planning - OUTPUTS
1. Risk management plan |
|
Risk Identification - INPUTS
|
Risk Identification - INPUTS
Process: Planning Knowledge: Risk 1. EEF 2. OPA 3. Project scope statement 4. Risk management plan 5. Project management plan |
|
Risk Identification - TOOLS
|
Risk Identification - TOOLS
1. Documentation review 2. Info gathering - brainstorming - Delphi - Interviewing - Root cause identification - SWOTS 3. Checklists 4. Assumptions analysis 5. Diagramming techniques - cause and effect - system or process flow charts - influence diagrams |
|
Risk Identification - OUTPUTS
|
Risk Identification - OUTPUTS
1. Risk register (includes list of risks, potential responses, root causes, triggers, and updated risk categories) |
|
Qualitative Risk Analysis - INPUTS
|
Qualitative Risk Analysis - INPUTS
Process: Planning Knowledge: Risk 1. OPA 2. Project scope statement 3. Risk managementplan 4. Risk register |
|
Qualitative Risk Analysis - TOOLS
|
Qualitative Risk Analysis - TOOLS
1. Risk probability and impact assessment 2. Probability and impact matrix |
|
Qualitative Risk Analysis - OUTPUTS
|
Qualitative Risk Analysis - OUTPUTS
1. Risk register(updates) |
|
Quantitative Risk Analysis - INPUTS
|
Quantitative Risk Analysis - INPUTS
Process: Planning Knowledge: Risk 1. OPA 2. Project scope statement 3. Risk management plan 4. Risk register 5. Project management plan |
|
Quantitative Risk Analysis - TOOLS
|
Quantitative Risk Analysis - TOOLS
1. Data gathering and representation techniques - Interviewing - Probability Distributions - EJ 2. Quantitative risk analysis and modeling techniques - Sensitivity Analysis - Expected monetary analysis - Decision tree analysis |
|
Quantitative Risk Analysis - OUTPUTS
|
Quantitative Risk Analysis OUTPUTS
1. Risk register(updates) includes 1)probabilistic analysis of project for schedule & cost outcomes 2)prioritized list of quantified risks 3)trends in quantitative risk results. |
|
Risk Response Planning - INPUTS
|
Risk Response Planning - INPUTS
Process: Planning Knowledge: Risk 1. Risk management plan 2. Risk register |
|
Risk Response Planning - TOOLS
|
Risk Response Planning - TOOLS
1. Strategies for negative Risks or threats 2. Strategies for positive risks or opportunities 3. Strategies for both threats and opportunities 4. Contingent response strategy |
|
Risk Response Planning - OUTPUTS
|
Risk Response Planning - OUTPUTS
1. Risk register(updates) 2. Project management plan(updates) 3. Risk-related contractual agreements |
|
Plan Purchases and Aquisitions - INPUTS
|
Plan Purchases and Aquisitions - INPUTS
Process: Planning Knowledge: Procurement 1. EEF 2. OPA 3. Project scope statement 4. WBS 5. WBS dictionary 6. Project management plan (risk regiter, risk related contractual agreements, resouce requirements, project schedule, activity cost estimates, cost baseline) |
|
Plan Purchases and Aquisitions - TOOLS
|
Plan Purchases and Aquisitions - TOOLS
1. Make or buy analysis 2. Expert Judgement 3. Contract Types |
|
Plan Purchases and Aquisitions - OUTPUTS
|
Plan Purchases and Aquisitions - OUTPUTS
1. Procurement Management Plan 2. Contract SOW 3. Make of buy decisions 4. Requested changes |
|
Plan Contracting - INPUTS
|
Plan Contracting - INPUTS
Process: Planning Knowledge: Procurement 1. Procurement management plan 2. Contract statement of work 3. Make or buy decisions 4. Project management plan (risk register, risk-related contractual agreements, resource requirements, project schedule, activity cost estimates, cost baseline) |
|
Plan Contracting - TOOLS
|
Plan Contracting - TOOLS
1. Standard forms 2. Expert judgment |
|
Plan Contracting - OUTPUTS
|
Plan Contracting - OUTPUTS
1. Procurement documents 2. Evaluation criteria (can include cost, technical capability, financial capacity, business type, references, etc…) 3. Contract statement of work (updates) |
|
Direct and Manage Project Execution - INPUTS
|
Direct and Manage Project Execution
Knowledge Area: Integration Process Group: Executing 1. Project management plan 2. Approved corrective actions 3. Approved preventive actions 4. Approved change requests 5. Approved defect repair 6. Validated defect report 7. Administrative closure procedure |
|
Direct and Manage Project Execution - TOOLS
|
Direct and Manage Project - TOOLS
1. PMM 2. PMIS |
|
Direct and Manage Project - OUTPUTS
|
Direct and Manage Project - OUTPUTS
1. Deliverables 2. Requested changes 3. Implemented change requests 4. Implemented corrective actions 5. Implemented preventative actions 6. Implemented defect repair 7. Work performance information (status, budget, % complete) |
|
Perform Quality Assurance - INPUTS
|
Perform Quality Assurance - INPUTS
Knowledge Area: Quality Process Group: Executing 1. Quality management plan 2. Quality metrics 3. Process improvement plan 4. Work performance information 5. Approved change requests 6. Quality control measurements 7. Implemented change requests 8. Implemented corrective actions 9. Implemented defect repair 10. Implemented preventative actions |
|
Perform Quality Assurance - TOOLS
|
Perform Quality Assurance - TOOLS
1. Quality planning tools and techniques 2. Quality audits 3. Process Analysis 4. Quality control tools and techniques |
|
Perform Quality Assurance - OUTPUTS
|
Perform Quality Assurance - OUTPUTS
1. Requested changes 2. Recommended corrective actions 3. Process analysis 4. Quality control tools and techniques |
|
Acquire Project Team - INPUTS
|
Acquire Project Team - INPUTS
Knowledge Area: HR Process Group: Executing 1. EEF 2. OPA 3. Roles and responsibilities 4. Project organization charts 5. Staffing management plan |
|
Acquire Project Team - TOOLS
|
Acquire Project Team - TOOLS
1. Pre-assignment 2. Negotiation 3. Acquisition 4. Virtual teams |
|
Acquire Project Team - OUTPUTS
|
Acquire Project Team - OUTPUTS
1. Project staff assignments 2. Resource availability 3. Staffing management plan (updates) |
|
Develop Project Team - INPUTS
|
Develop Project Team - INPUTS
Knowledge Area: HR Process Group: Executing 1. Project staff assignments 2. Staffing management plan 3. Resource availability |
|
Develop Project Team - TOOLS
|
Develop Project Team - TOOLS
1. General management skills 2. Training 3. Team-building activities 4. Ground rules 5. Co-location (tight matrix) 6. Recognition and rewards |
|
Develop Project Team - OUTPUTS
|
Develop Project Team - OUTPUTS
1. Team Performance Assessments |
|
Information Distribution - INPUTS
|
Information Distribution - INPUTS
Knowledge Area: Communication Process Group: Executing 1. Communications management plan |
|
Information Distribution - TOOLS
|
Information Distribution - TOOLS
1. Communications Skills 2. Information gathering and retrieval systems 3. Information distribution methods 4. Lessons learned process |
|
Information Distribution - OUTPUTS
|
Information Distribution - OUTPUTS
1. OPA 2. Requested changes |
|
Request Seller Responses - INPUTS
|
Request Seller Responses - INPUTS
Knowledge Area: Procurement Process Group: Executing 1. OPA 2. Procurement management plan 3. Procurement documents |
|
Request Seller Responses - TOOLS
|
Request Seller Responses - TOOLS
1. Bid Advertising 2. Bidder Conference 3. Develop Qualified Sellers List |
|
Request Seller Responses - OUTPUTS
|
Request Seller Responses - OUTPUTS
1. Qualified sellers list 2. Procurement document package 3. Proposals |
|
Select the Seller - INPUTS
|
Select the Seller - INPUTS Knowledge Area: Procurement
Process Group: Executing 1. OPA 2. Procurement management plan 3. Evaluation criteria 4. Procurement document package 5. Proposals 6. Qualified sellers list 7. Project management plan (risk register, risk-related contractual agreements, resource requirements, project schedule, activity cost estimates, cost baseline) |
|
Select the Seller - TOOLS
|
Select the Seller - TOOLS
1. Weighting system 2. Independent estimates 3. Screening system 4. Contract negotiation 5. Seller rating system 6. Expert judgment and proposal evaluation system |
|
Select the Seller - OUTPUTS
|
Select the Seller - OUTPUTS
1. Selected sellers 2. Contract 3. Contract management plan 4. Resource availability 5. Procurement management plan (updates) 6. Requested changes |
|
Monitor and Control Project Work - INPUTS
|
Monitor and Control Project Work - INPUTS
Process: Monitor and Control Knowledge: Integration 1. Project management plan 2. Work performance information 3. Rejected change requests |
|
Monitor and Control Project Work - TOOLS
|
Monitor and Control Project Work - TOOLS
1. PMM 2. PMIS 3. EJ 4. Earned Value Mangement |
|
Monitor and Control Project Work - OUPTUS
|
Monitor and Control Project Work - OUTPUTS
1. Recommended corrective actions 2. Recommended preventative actions 3. Forecasts 4. Recommended defect repair 5. Requested changes |
|
Integrated Change Control - INPUTS
|
Integrated Change Control - INPUTS
Process: Monitoring and Controling Knowledge: Integration 1. Project Management Plan 2. Requested Changes 3. Work Performance Information 4. Recomended Preventetive Actions 5. Recommended Corrective Actions 6. Recommended Defect Repair 7. Deleverables |
|
Integrated Change Control - TOOLS
|
Integrated Change Control - TOOLS
1. PMM 2. PMIS 3. EJ |
|
Scope Verification - TOOLS
|
Scope Verification - TOOLS
1. Inspection |
|
Integrated Change Control - OUTPUTS
|
Integrated Change Control - OUTPUTS
1. Approved change requests 2. Rejected change requests 3. Project management plan (updates) 4. Project scope management (updates) 5. Approved corrective actions 6. Approved preventative actions 7. Approved defect repair 8. Validated defect repair 9. Deliverables |
|
Scope Verification - INPUTS
|
Scope Verification - INPUTS
Process: M&C Knowledge: Scope 1. Project scope statement 2. WBS dictionary 3. Project scope management plan 5. Deliverables |
|
Scope Control - TOOLS
|
Scope Control - TOOLS
1. Change Control System 2. Vaiance Analysis 3. Replanning 4. Configuration Management System |
|
Scope Verification - OUTPUTS
|
Scope Verification - OUTPUTS
OUTPUTS: 1. Project scope statement (updates) 2. WBS dictionary 3. Project Scope Management 4. Deliverables |
|
Scope Control - INPUTS
|
Scope Control - INPUTS
Process: M&C Knowledge: Scope 1. Project scope statement 2. WBS 3. WBS dictionary 4. Project scope management plan 5. Performance reports 6. Approved change requests 7. Work performance information |
|
Scope Control - OUTPUTS
|
Scope Control - OUTPUTS
1. Project scope statement (updates) 2. WBS (updates) 3. WBS dictionary (updates) 4. Scope baseline (updates) 5. Requested changes 6. Recommended corrective action 7. OPA (updates) 8. Project Management Plan (updates) |
|
Schedule Control - TOOLS
|
Schedule Control - TOOLS
1. Progress Reporting 2. Scheduled change control system 3. Performance Measurement 4. PMS 5. Variance Analysis 6. Schedule Comparison Bar Charts |
|
Schedule Control - OUTPUTS
|
Schedule Control - OUTPUTS
1. Schedule model data (updates) 2. Schedule baseline (updates) 3. Performance measurements 4. Requested changes 5. Recommended corrective actions 6. OPA 7. Activity list (updates) 8. Activity attributes (updates) 9. Project management plan (updates) |
|
Schedule Control - INPUTS
|
Schedule Control - INPUTS
Process: M&C Knowledge: Time 1. Schedule management plan 2. Schedule baseline 3. Performance reports 4. Approved change requests |
|
Cost Control - INPUTS
|
Cost Control - INPUTS
Process: M&C Knowledge: Cost 1. Cost baseline 2. Project funding requirements 3. Performance reports 4. Approved change requests 5. Project management plan |
|
Cost Control - TOOLS
|
Cost Control - TOOLS
1. Cost control system 2. Performance measurement analysis 3. Forecasting 4. Project performance reviews 5. PMS 6. Variance Management |
|
Cost Control - OUTPUTS
|
Cost Control - OUTPUTS
1. Cost estimate (updates) 2. Cost baseline (updates) 3. Performance measurements 4. Forecasted completion 5. Requested changes 6. Recommended corrective actions 7. Organizational process assets (updates) 8. Project management plan (updates) |
|
Perform Quality Control - INPUTS
|
Perform Quality Control - INPUTS
Process: M&C Knowledge: Quality 1. Quality management plan 2. Quality metrics 3. Quality checklists 4. OPA 5. Work performance information 6. Approved change requests 7. Deliverables |
|
Manage Project Team - OUTPUTS
|
Manage Project Team - OUTPUTS
1. Requested changes 2. Recommended corrective actions 3. Recommended preventative actions 4. OPA (updates) 5. Project management plan (updates) |
|
Perform Quality Control - TOOLS
|
Perform Quality Control - TOOLS
1. Cause and effect diagrams 2. Control charts 3. Flow charts 4. Histograms 5. Pareto charts 6. Run charts 7. Scatter diagram 8. Statistical sampling 9. Inspection 10. Defect repair review |
|
Perform Quality Control - OUTPUTS
|
Perform Quality Control - OUTPUTS
1. Quality control measurements 2. Validated defect repair 3. Quality baseline (updates) 4. Recommended corrective actions 5. Recommended preventative actions 6. Requested changes 7. Recommended defect repair 8. OPA 9. Validated deliverables 10. Project management plan (updates) |
|
Performance Reporting - INPUTS
|
Performance Reporting - INPUTS
Process: M&C Knowledge: Communications 1. Work performance information 2. Performance measurements 3. Forecasted completion 4. Quality control measurements 5. Project management plan (performance measurement baseline) 6. Approved change requests 7. Deliverables |
|
Performance Reporting - TOOLS
|
Performance Reporting - TOOLS
1. Presentation tools 2. Performance information gathering and compilation 3. Status review meetings 4. Time reporting systems 5. Cost reporting systems |
|
Manage Project Team - INPUTS
|
Manage Project Team - INPUTS
Process: M&C Knowledge: HR • OPA • Project staff assignments • Roles and responsibilities • Project organizational charts • Staffing management plan • Team performance assessment • Work performance information • Performance reports |
|
Manage Project Team - TOOLS
|
Manage Project Team - TOOLS
1. Observations and conversation 2. Project performance appraisals 3. Conflict Management 4. Issue Log |
|
Performance Reporting - OUTPUTS
|
Performance Reporting - OUTPUTS
1. Performance reports 2. Forecasts 3. Requested changes 4. Recommended corrective actions 5. OPA |
|
Manage Stakeholders INPUTS
|
Manage Stakeholders INPUTS
1. Communications management plan 2. OPA : |
|
Manage Stakeholders TOOLS
|
Manage Stakeholders TOOLS
1. Communications Methods 2. Issue Logs |
|
Manage Stakeholders OUTPUTS
|
Manage Stakeholders OUTPUTS
1. Communications management plan 2. OPA OUTPUTS: 1. Resolved issues 2. Approved change requests 3. Approved corrective actions 4. OPA 5. Project management plans (updates) |
|
Risk Monitoring and Control - INPUTS
|
Risk Monitoring and Control - INPUTS
Process: M&C Knowledge: Risk 1. Risk management plan 2. Risk register 3. Approved change requests 4. Work performance information 5. Performance reports |
|
Risk Monitoring and Control - TOOLS
|
Risk Monitoring and Control - TOOLS
1. Risk reassesment 2. Risk Audits 3. Variance and trend analysis 4. Technical performance measurement 5. Reserve analysis 6. Status Meetings |
|
Risk Monitoring and Control - OUTPUTS
|
Risk Monitoring and Control - OUTPUTS
1. Risk register (updates) 2. Requested changes 3. Recommended corrective actions 4. Recommended preventative actions 5. OPA 6. Project management plan (updates) |
|
Contract Administration - INPUTS
|
Contract Administration - INPUTS
Process: M&C Knowledge: Procurement 1. Contract 2. Contract management plan 3. Selected sellers 4. Performance reports 5. Approved change requests 6. Work performance information |
|
Contract Administration - TOOLS
|
Contract Administration - TOOLS
1. Contract change control system 2. Inspections and audits 3. Performance reporting 4. Payment system 5. Claims administration 6. Records management system 7. IT tools |
|
Contract Administration - OUTPUTS
|
Contract Administration - OUTPUTS
1. Contract documentation 2. Requested changes 3. Recommended corrective actions 4. OPA 5. Project management plan (updates) |
|
Close Project - INPUTS
|
Close Project - INPUTS
Process: Closing Knowledge: Integration 1. Project management plan 2. Contract documentation 3. EEF 4. OPA 5. Work performance information 6. Deliverables |
|
Close Project - TOOLS
|
Close Project - TOOLS
1. PMM 2. PMIS 3. EJ |
|
Close Project - OUTPUTS
|
Close Project - OUTPUTS
1. Administrative closure procedure 2. Contract closure procedure 3. Final product, service or result 4. OPA (updates) |
|
Contract Closure - INPUTS
|
Contract Closure - INPUTS
Process: Procurement Knowledge: Closing 1. Procurement management plan 2. Contract management plan 3. Contract documentation 4. Contract closure procedure |
|
Contract Closure - TOOLS
|
Contract Closure - TOOLS
1, Procurement audits 2. Record management system |
|
Contract Closure - OUTPUTS
|
Contract Closure - OUTPUTS
1. Closed contracts 2. OPA (update contract file, deliverable acceptance, and lessons learned documentation) |