- Shuffle
Toggle OnToggle Off
- Alphabetize
Toggle OnToggle Off
- Front First
Toggle OnToggle Off
- Both Sides
Toggle OnToggle Off
Front
How to study your flashcards.
Right/Left arrow keys: Navigate between flashcards.right arrow keyleft arrow key
Up/Down arrow keys: Flip the card between the front and back.down keyup key
H key: Show hint (3rd side).h key
![]()
PLAY BUTTON
![]()
PLAY BUTTON
![]()
12 Cards in this Set
- Front
- Back
|
1. List the required information needed to process a DSW.
|
Facility ID number, Customer Organization & office symbol, The location of work, Requestors Name and Rank, Requestor Phone number, Complete description of work, Special circumstances
|
|
2. How do you assign the proper Customer Account Code to a DSW?
|
Use PF-14 to bring up a list of customer codes.
|
|
3. How do you assign the proper Cost Account/ Air Force Account Code to a DSW?
|
Using PF-14 will bring up a list of associated codes. Select the appropriate code by placing a X next to it and hit enter.
|
|
4. What is a Cost Center?
|
identifies specific CE shops in IWIMS. Each shop is responsible for specific types of work.
|
|
5. Which CE shop will be responsible for installing a wall in an existing room?
|
Vertical Repair Shop code 441-WA
|
|
6. Which CE shop will be responsible for repairing light fixtures in a building?
|
Interior electrical -WB 441-WB
|
|
7. Which CE shop will be responsible for water leaking in a restroom or latrine?
|
Utilities Shop
|
|
8. Where can you get current information regarding shop rates?
|
Resources Financial Management Flight
|
|
9. Authorization for DSWs is ussually delegated to the______ and it is done_____.
|
lowest possible level, IN WRITING
|
|
10. What should be done if a DSW is cancelled?
|
Can only be canceled at the same or higher level of approval, also the customer should be notified of cancellation, in writing if required.
|
|
11. What are two ways you can close a work order?
|
Close it in the labor program, or select pF17 while looking at the wokorder, then select PF3 to close/reopen the workorder, then hit PF1 twice.
|
|
12. What must be done with a work order after all work has been completed?
|
closed
|