• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
Front

How to study your flashcards.

Right/Left arrow keys: Navigate between flashcards.right arrow keyleft arrow key

Up/Down arrow keys: Flip the card between the front and back.down keyup key

H key: Show hint (3rd side).h key

image

PLAY BUTTON

image

PLAY BUTTON

image

Progress

1/12

Click to flip

12 Cards in this Set

  • Front
  • Back
1. List the required information needed to process a DSW.
Facility ID number, Customer Organization & office symbol, The location of work, Requestors Name and Rank, Requestor Phone number, Complete description of work, Special circumstances
2. How do you assign the proper Customer Account Code to a DSW?
Use PF-14 to bring up a list of customer codes.
3. How do you assign the proper Cost Account/ Air Force Account Code to a DSW?
Using PF-14 will bring up a list of associated codes. Select the appropriate code by placing a X next to it and hit enter.
4. What is a Cost Center?
identifies specific CE shops in IWIMS. Each shop is responsible for specific types of work.
5. Which CE shop will be responsible for installing a wall in an existing room?
Vertical Repair Shop code 441-WA
6. Which CE shop will be responsible for repairing light fixtures in a building?
Interior electrical -WB 441-WB
7. Which CE shop will be responsible for water leaking in a restroom or latrine?
Utilities Shop
8. Where can you get current information regarding shop rates?
Resources Financial Management Flight
9. Authorization for DSWs is ussually delegated to the______ and it is done_____.
lowest possible level, IN WRITING
10. What should be done if a DSW is cancelled?
Can only be canceled at the same or higher level of approval, also the customer should be notified of cancellation, in writing if required.
11. What are two ways you can close a work order?
Close it in the labor program, or select pF17 while looking at the wokorder, then select PF3 to close/reopen the workorder, then hit PF1 twice.
12. What must be done with a work order after all work has been completed?
closed