- Shuffle
Toggle OnToggle Off
- Alphabetize
Toggle OnToggle Off
- Front First
Toggle OnToggle Off
- Both Sides
Toggle OnToggle Off
Front
How to study your flashcards.
Right/Left arrow keys: Navigate between flashcards.right arrow keyleft arrow key
Up/Down arrow keys: Flip the card between the front and back.down keyup key
H key: Show hint (3rd side).h key
![]()
PLAY BUTTON
![]()
PLAY BUTTON
![]()
4 Cards in this Set
- Front
- Back
|
1. What are the two-part operation of Work Control Method?
|
beddown and sustainment
|
|
2. What happens after all the utilities have been connected to their facilities?
|
the distrubition systems are buried and passive defense measures begin to take place.
|
|
3. When does CE personnel function the task required to keep the base operating in a day to day mode?
|
Sustainment
|
|
4. What is the key to sustaining equipment capabilities?
|
recurring maintenance
|