- Shuffle
Toggle OnToggle Off
- Alphabetize
Toggle OnToggle Off
- Front First
Toggle OnToggle Off
- Both Sides
Toggle OnToggle Off
Front
How to study your flashcards.
Right/Left arrow keys: Navigate between flashcards.right arrow keyleft arrow key
Up/Down arrow keys: Flip the card between the front and back.down keyup key
H key: Show hint (3rd side).h key
![]()
PLAY BUTTON
![]()
PLAY BUTTON
![]()
36 Cards in this Set
- Front
- Back
|
What are the components of Lifecycle data management?
|
DIPE
• Document management • Product structure management • Integration • Engineering change and configuration management |
|
What interface is used to transfer engineering information to the ERP system?
|
PLM interface
|
|
What is used to manage the product data?
|
Product structure browser
|
|
What method can be used to run a separate system for engineering process in addition to a production system?
|
Replication of product data
|
|
How are external files integrated into mySAP ERP
|
Document Management system
|
|
How are the original documents made available to other objects?
|
By linking the Document Info Record to them
|
|
Document is made up of ____ and ____
|
Document info record and the originals, which can be in paper, folder or electronic form.
|
|
What is the purpose of the document info record? (224)
|
Helps to manage originals
Controls process flow Integrates to ECC through object links Allows viewing of originals DMS system allows easy way to handle documents |
|
How are original documents made available to other SAP objects
|
By linking document info records to them
|
|
What kinds of systems can be connected to mySAP ERP through PLM?
|
CADand CAx, GIS, Classification systems and Office apps
|
|
What kind of data exchange does the PLM link offer?
|
Bi-directional
|
|
What kind of data exchange does the PLM link offer?
|
Bi-directional
|
|
Is SAP GUI always used to interact with linked applications T/F?
|
F. GUI and non-GUI mode are available
|
|
Under which mode is the SAP system invisible to the end user in the context of PLM?
|
When working without GUI
|
|
What technology options are used in PLM?
|
BAPI and RFC
|
|
Display and processing of orginals
|
ECL viewer and Micro. Office intergration
|
|
What is the main purpose of Classification?
|
To enable flexible searching
|
|
Explain how searching with the classification system works
|
• Create characteristics and allowed values
• Create classes and assign characteristics to them • Create objects and assign classes to objects (also assign characteristic values for this object) • Search for objects by specifying the class to which it belongs and then specifying the values for the characteristics of the class |
|
How does classification take place?
|
Directly in the object or indirectly in a transaction within the classification system
|
|
What is a configurable material?
|
A product that can be made in several variants. Configurable material is not a finished product.
|
|
What feature is used to select the materials and operations for a specific variant of a configurable material?
|
Dependencies
|
|
What is the central navigation tool in lifecycle data management?
|
Product structure browser. It allows us to call up information on materials, BOM, documents, characteristics and routings
Filters allows to limit the detail that is displayed. |
|
What component allows the direct viewing of originals in the product structure browser?
|
Enterprise Application Integration
|
|
What is the single tool that can be used to maintain BOMs and routings
|
Engineering workbench (EWB)
|
|
What other advantage does EWB provide?
|
Locking individual items of BOM rather than the whole BOM. Thus many users can work on different items of the same BOM simultaneously
Also provides information on how to contact other persons who are working on locked items |
|
What are the advantages of using Engineering Change Management (ECM) for making changes?
|
• Can group related changes for many objects
• Allows documenting and monitoring of changes • Good tracking of changes as multiple change statuses are allowed • Can specify effective dates for changes • Changes can be integrated into the logistics chain through release keys |
|
PLM Interface
COGC |
CAD, CAx Systems
Geographical Info Systems Office applications Classificaiton Systems |
|
Product Structure Browser
|
Graphical Tool
|
|
Why make changes with Engineering Change management ?
CHIMPS |
Changes that belong together are grouped by change #
Saving multiple changes for an object Planning and realization of specific effectivity Monitoring and document changes. Intergration in logistics process chain |
|
Structure of change number
|
HEADER -
Reason for change Vailidity Status OBJECT TYPES Material BOM Task List( routings) OBJECT MANAGEMENT RECORDS - actual objects to be changed |
|
Engineering Workbench
|
used as an maintenance environment for product structures and can do more than simply create BOMs and Routings. You can maintain then in EWB
|
|
Product Structure Brower
|
Central navigation tool in LCM
- displays in tree structure objects that belong to each other functionally; BOMS, Doc. Routings, characteristics |
|
ECR/ECO
|
Have to have ECR for ECO
|
|
What are the components of a change number?
|
• Change header (general info -- date, validity, status)
• Object types • Object management records (Actual objects affected) • Other info (accompanying docs, Classification -- facilitates search for changes, alternate dates for individual objects) |
|
What is the general workflow for engineering changes
|
• User creates a change record
• User makes changes by creating an ECR (Engineering change request) • The ECR is converted into an ECO (Engineering change order) • The actual change takes place once the ECO is checked and released. |
|
1. Your company is implementing the manufacturing execution component in PP. As part of the implementation team, you need to address the master data requirements to run manufacturing execution. Which of the following will be required
|
a. Material
b. PRT d. Workcenter e. Routing f. BOM |