32 Cards in this Set
- Front
- Back
|
What different types of production does SAP support?
|
• Order controlled production with production order
• Order controlled production with process order • Period and quantity oriented production -- not order oriented • Project oriented production with production lots • Kanban -- replenishment controlled using stock transfer, external procurement and in-house production via self controlled control cycle |
|
What organization levels does manufacturing execution use
|
Client, company code, plant, storage location
|
|
What master data are used in manuf exec?
|
Material, BOM, Work center/resource, Task lists, PRT (Production resources/tools)
|
|
What material type should materials to be produced have?
|
In-house production (X or E)
|
|
What are the types of task lists?
|
Routings, rate routings, master recipes
|
|
PRT’s are assigned to ______ ?
|
The routing of operations
|
|
Which material master views are maintained for manufacturing?
|
MRP, Work scheduling
|
|
What does task list usage determine in a Work Center (Resource) master?
|
The task list types (routing, rate routing, …) in which this resource can use used
|
|
How is a resource connected to cost accounting? (265
|
By assigning a cost center
|
|
Standard and default values for operations can be assigned in a resource master T/F?
|
T
|
|
What data in the resource master allows capacity planning?
|
Available capacity and formula key
|
|
What data in the work center master p;lay a role in calculating operation timings in routings?
|
Operation standard values in the scheduling formulas
|
|
BOM components and PRT can be assigned at the operation level --
|
however, if this is not specified in the routing, they are then assigned at the BOM level (see page 280 also)
|
|
How is the procurement time for BOM components related to operations?
|
Procurement (and consumption) takes place as per the start time of the operation for which the material is needed.
|
|
Which of the following steps cannot be automated in production order processing (select all that apply)?
|
a)Order creation, b)machine reservation, e)WIP determination
|
|
Which activities generally occur in the background?
|
WIP determination, variance calculation and order settlement
|
|
What are the available options for order creation?
|
Without routing and BOM
With routing With routing and BOM From planned order |
|
What happens if a BOM is changed after a planned order is created but before the planned order is subsequently converted into a production order?
|
The BOM is not re-read and the production order uses the old BOM
|
|
What is the action that sets in motion further processing of a production order?
|
Releasing the order
|
|
What are the levels at which order release can be performed? (
|
Individual operation,
whole order , several orders together |
|
What are the things checked during availability check for an order
|
Material, capacity, PRT)
|
|
Which of the following activities occur (select all) during a goods issue posting for production
|
Reduction of reservation
Material document is created ???Determination of actual costs??? |
|
What kinds of settlement are possible for production orders? (
|
Order related and product related
|
|
What kinds of FI and CO postings are made in order settlement?
|
FI only -- for WIP balances
Both FI and CO -- for variances |
|
Order Creation Options
|
Without routing and BOM
Create with routing Create with routing and BOM Create with planned order |
|
WIP, variance calculation and settlemetnt are
|
Periodic processing activites for Cost Object Controlling
Happen Usually in background |
|
Order Release
|
Nothing can happen till release then
Print Documents Material Withdrawals Processing Confirmations Goods reciept Settlement |
|
Order release
|
A status is set
Availability check automatically |
|
You can release
|
an individual operation
a whole order several orders together (mass release) |
|
Production order Goods Issue Posting
|
-Reservation goes away
- Goods issue slip (optional) - MM doc & FI doc -Credit Stock account -Debit Consumption account -G/L accounts -Stock and consumption fields updated. -Determination of actual costs |
|
Confirmations
|
Order related
Operation related |
|
Operation related Confirmations
|
Time ticket/confirmation slip
Collective/quick entry Milestone Progress Time Event |