17 Cards in this Set
- Front
- Back
|
What directive contains information on Operational Risk Management (ORM)?
|
OPNAVINST 3500.39
|
|
What is an effective process for maintaining readiness in peacetime and achieving success in combat without infringing upon the prerogratives of the commander?
|
Operational Risk Management (ORM)
|
|
What is a decision making process that enhances operational capability?
|
Operational Risk Management
|
|
Operational Risk Management is integrated into what level of a command?
|
All levels of the command
|
|
What is a condition with the potential to cause personal injury or death, property damage or mission degradation?
|
Hazard
|
|
What is meant by the ORM term "risk"?
|
An expression of possible loss in terms of severity and probability.
|
|
What is the process of detecting hazards and assessing associated risks?
|
Risk Assessment
|
|
What is the process of dealing with risk associated within military operations, which includes risk assessment, risk decision making and implementation of effective risk controls?
|
Operational Risk Management
|
|
What are the five steps of the Operational Risk Management(ORM) process?
|
1)Identify hazard 2)Assess hazards 3)Make risk decisions 4)Implement controls 5)Supervise
|
|
What are the three ORM Process Levels?
|
1)Time-critical 2)Deliberate 3)In-depth
|
|
What level of the Operational Risk Management (ORM) process is employed by experienced personnel to consider risk while making decisions in a time-compressed situation?
|
Time-critical level
|
|
What level of the Operational Risk Management (ORM) process uses primarily experience and brainstorming to identify hazards and develop controls (and therefore is most effective when done in a group)?
|
Deliberate Level
|
|
What level of the Operational Risk Managment (ORM) process is used to more thoroughly study the hazards and their associated risk in a complex operation or system, or one in which the hazards are not well understood?
|
In-depth Level
|
|
What are the four pronciples of Operational Risk Management?
|
1)Accept risk when benefits outweigh the cost 2)Accept no unnecessary risk 3)anticipate and manage risk by planning 4)Make risk decisions at the right level
|
|
What is the goal of Operational Risk Management?
|
Not to eliminate risk, but to manage the risk so that the mission can be accomplished with the minimum amount of loss
|
|
When does a leader responsible for executing a mission, elevate the decision to their chain of command?
|
When the leader determines that the risk associated with that mission CANNOT be controlled at his/her level, or goes beyond the commander's stated intent.
|
|
OPNAVINST 3500.39 Operational Risk Management
|
OPNAVINST 3500.39 Operational Risk Management
|