On approach to a confirmed gas leak with no fire or explosion, what are the initial steps to be taken
|
-Utilize the 10 Haz Mat steps, inclusive of evacuating if prudent, establish an exclusion/hot zone keeping all personnel away from the area
|
|
On approach to a confirmed gas leak with no fire or explosion, how far away do you park your apparatus
|
-Park a minimum of 100 feet away, up wind depending on hydrant location
-Instruct all other arriving resources to stage at least 100 feet up wind and wait for an assignment |
|
If a gas leak is CONFIRMED, what action must take place
|
Upgrade response to a full structure response if it hasn't already occurred
|
|
On a confirmed gas leak, what will the approaching crew do
|
The investigating FF and CA will be in full PPE including SCBA, on air, and a CO2 extinguisher in hand. Use a gas monitor to check the atomesphere, if no gas monitor on hand, do not enter the structure until you have one available
|
|
What is to occur if any amount of gas is detected by odor
|
-Upgrade response if it has not yet occurred, incident should then be declared a Haz Mat incident, all utilities to the building will be shut off as long as they are located on the exterior of the structure (gas and electrical)
-Do not enter the strucutre to shut off gas or electrical |
|
If you can detect a gas odor you must until you get approval from ___ or ___ before entering a structure
|
HIT or IC
|
|
On a confirmed gas leak, and a rescue is needed, how do we perform
|
-Full PPE
-Utilize a charged attack line -Consider requesting a full 1st or 2nd alarm if occupants are still trapped and need to be rescued -As soon as reasonable establish 2 out with an equal sized hose line |
|
What do you do with the electrical panel box on a confirmed gas leak
|
Purge with a CO2 estinguisher to prevent explosion
|
|
If there is any flammable gas readings detected near an electrical panel, what do we do
|
We DO NOT shut it off
|
|
Any readings in the gas monitor of ____ or more of the LEL indicates an explosive environment
|
-10 PPM or greater
-Do not enter this atmosphere until measures to lower the LEL have been mitigated by the HIT |
|
Upon confirmation of an IDLH atmosphere, what can you do to the building prior to the arrival of HIT and PG&E
|
Open doors and windows only if it is safe to do so
|
|
If PG and E is called upon to excavate what can we do to assist
|
Provide stand by protection with a charged hose line and a minimum of 2 firefighters in full PPE and SCBA
|
|
If an explosion has occurred what are some of the more important actions that we can take
|
-Evacuate all civilians within 250 feet of blast site
-Keep the number of FD personnel to a minimum number necessary to stabilize the situation with intial staging of 100 feet upwind and upgrade -Let HIT figure out when its safe, where the source is etc |
|
Gas investigations in a nutshell
|
-One unit code 3 on an initial gas investigation
-Upon confirmation, call will be upgraded to a structure response and HIT will be requested to respond code 3 -PG and E will be requested -IC shall declare the incident as a HAZMAT incident |
|
Personnel safety concerning a gas investigation
|
-All personnel working in the exclusion/hot zone, inclusive of shutting off a gas line, will wear full PPE with SCBA, on air
-They will be protected by a back up crew staffed with a charged hose line and the same level of PPE |