- Back
|
Define size up
|
Has been described as the mental evaluation made by an officer in charge of an emergency which enables that officer to determine a course of action to accomplish the officers mission
|
|
Is size up one minded or continuous
|
Its a continuous evaluation of all the influencing factors at an emergency which enables that officer to determine a course of action and to accomplish the officer's mission
|
|
Upon reciept of the alarm, an officer must draw upon knowledge of the area including what 5 factors
|
-Its water supply
-Type of structure -Occupancies -What other companies are responding -From what direction |
|
In an analysis of the situation when heading to a structure fire, what 4 things will the officer be thinking about
|
-What is burning
-Where it is going -If the fire involves haz mat or high-rise, use appropriate policies and procedures |
|
What is the policy of the SJFD on fully involved structure fires with no life hazard and little hope of saving the building
|
Policy says we don't commit personnel to interior firefighting in this situation
|
|
For fires above the 3rd floor, 1st in engine shall do ___
|
Connect to the sprinkler/standpipe system, charging the standpipe 2st
|
|
If the fire is 3rd floor or lower, which engine is to charge the standpipe/sprinkler system
|
2nd in engine
|
|
In a high rise situation, who always takes the standpipe/sprinkler system and makes sure that its charged
|
The 1st in engine
|
|
Who clears the public, tenants, and owners to enter a fire building
|
The IC
|
|
Whose reponsibility is it to call greater alarms
|
The IC is responsible for calling greater alarms
|
|
When should a greater alarm be called - 5 items
|
-Life hazard
-Fire involving more than 1 floor of a building - possible exception is a single family residence or smaller -Heavy smoke or fire showing in a structure of appreciable size (25000 cubic feet ie 50x50x10) or greater -Personnel level - if the workload exceeds the personnel level of the 1st alarm -Access to fire area - delayed because of height, building design, or topography |
|
1st alarm response
|
211
-2 engines -1 truck or USAR -1 BC |
|
Full 1st alarm
|
-1 engine company
-1 truck or USAR -1 BC -Med 30 |
|
Total complement for a full 1st alarm
|
322M
-3 engine companies -2 truck or USARS -2 BC's -Med 30 |
|
Who is notified when a full 1st alarm is working
|
The duty chief
|
|
2nd alarm response
|
Full 1st alarm plus
-2 Engine companies -1 Truck or USAR company -1 BC -Division chief -Med 30 -DSO (no longer exists) -Air 6 -HIT 25 -Duty investigator -Request PG and E |
|
3rd alarm response
|
Everything that goes with a 1st, and 2nd alarm plus
-2 Engine companies -1 Truck or USAR company -Communications BC and supervising PSD to communications -Duty mechanic -IDT -Fire associates -Request appropriate water company response |
|
4th alarm response
|
Everything that goes with a 1st, 2nd, and 3rd plus
-2 Engine companies -1 Truck or USAR company -1BC -40 hour personnel to BFO campus with turnouts if its during normal working hours -Mutual aid request |
|
5th alarm response
|
All that comes with a 1-4th alarm plus
-2 Engine compaines -1 Truck or USAR company |
|
What is the rule for an engine that is supplying a master stream
|
No handlines should be taken from this engine
|
|
Stang operations require an important detail - what is it
|
You must have your own supply line established
|
|
Who will give the orders for a ladder pipe operation
|
The IC only
|
|
The 6 criteria for establishing rehab
|
-45 minutes of continuous work or 2 SCBA bottles used
-3 hours of safely paced work no SCBA required -Sustained work in a smoky wildland environment -Outside temperature is >85 degrees F -Distribution of fire line meals is likely -IC determines that its necessary |
|
Rehab staffing
|
-1 ALS crew
-Med 30 -HIT 25 rehab equipment |
|
Procedure for requesting rehab
|
-CA will advise of their need for rehab to their Div supervisor, who will clear request via OPS or IC
-Companies will not report to rehab until authorized -Companies will report to rehab together |
|
Truck strip (PASS)
|
PASS
-Pike poles -Axe or forcible entry tool -Salvage cover -Spare SCBA cylinder per person |
|
When someone gets injured at a fire who is notified
|
-The IC will be made aware immediately, and this information will be reported on the NFIRS
-DSO will also be notified |
|
When a fire death occurs, what are the 4 steps that will be taken
|
-Notify communication to dispatch the arson investigator
-Do not request the coroner -Stand by until the arson investigator arrives -Arson investigator will assume responsibility for PD and coroner notification |
|
What are 6 things members of the FD must observe surrounding fatalities at fires
|
-Location and position of bodies
-Where bodies are removed to and from on the premises -Distances from openings and objects -Whether doors and windows were locked or opened -Marks of violence on victims -Where the fire started and its severity |
|
What are the accepted priorities for strategic decisions when fighting fire
|
-Safety of citizens
-Safety of FF personnel -Property conservation |
|
What modes do we go to as strategy when fighting fire
|
-Offensive
-Defensive -Rescue |
|
What is strategy based on
|
Evaluation of the situation, risk potential, and capabilities of resources
|
|
What must EVERY company be prepared to do as their first priority on the scene of a fire
|
Perform search and rescue
|
|
High risk high reward
Low risk low reward No risk no reward |
These are the basics that we must live by when performing rescue and offensive firefighting tactics
|
|
Endangerment of life dictates the placement of ___ hoseline
|
first
|
|
Define RECEO
|
-Rescue
-Exposure -Confine the fire -Extinguishment of the fire -Overhaul |
|
After the fire has been deemed under control, what will the IC mandate
|
A 20 minute cool down period after initial knockdown before considering overhaul operations
|
|
After a fire, as overhaul operations start, SCBA whall be worn when CO levels are ___
|
35 ppm or above
|