What are the 4 components of the RRR team?
|
Damage Assessment Team
MOS Selection Team Crater Repair Crew Hauling Crew |
|
What does the team member of the DAT team do?
|
Directs DAT team down the runway
Receives all damage assessment information Accurately transmits all information to the MOS team |
|
What are the functions of the MOS selection team?
|
Plots the damage on runway map
Maintains status boards Selects new runway location Determines the size of runway |
|
What is the function of the crater repair crew?
|
Responsible for FOD cover crew
Ensures proper criterion is met Each crew is responsible for two craters |
|
What is the recommended 8 personnel crater repair crew?
|
One team leader
4 EO's 3 Laborers |
|
What is the recommended CESE for a crater repair crew?
|
One loader
One Dozer One vibratory roller One grader One light plant One air compresser One concrete saw |
|
What are some types of crater repairs?
|
Crush stone repairs (mostly taxiways)
Sand Grid Regulated set Portland Cement Pre-cast slabs |
|
What are the 4 different FOD covers?
|
Folded FRP
Bolted FFP AM2 Matting Pre cast concrete slab |
|
What are two types of fiberglass FOD covers?
|
Folded Fiberglass matting (FFP)
Bolted Fiberglass matting (FRP) |
|
What are the 4 types of spall repair methods?
|
Silikal
Cold Patch Asphalt Magnesium Phosphate Regulated Set Portland Cement |
|
What are the RRR training requirements for a battalion?
|
46 personnel E-6 and below level 1 trained
20 personnel E-5 and above level 2 trained 6 personnel E-6 and below cretemobile trained |