usace

flashcards   change
help searching
sort: best match most recent popularity
Social Networking
RSS
Found: 4 — Displaying 1 - 4
  • ER 1110-2-1302 CIVIL WORKS COST ENGINEERING - Flashcards: 6

    Description: This engineer regulation (ER) provides policy, guidance, and procedures for cost engineering responsibilities for all civil works (CW) projects assigned to the U.S. Army Corps of Engineers (USACE).
    Popularity 0
    Tags civil cost engineer estimate usace
    Author: Groboski
    Created: 2009-12-26
  • ER 1110-2-1150 ENGINEERING AND DESIGN FOR CIVIL - Flashcards: 14

    Description: This regulation uses the five phases (reconnaissance, feasibility, preconstruction engineering and design, construction, and operation and maintenance1) of a major Civil Works project requiring specific congressional authorization to present the engineering and design policy and process that applies to all projects and products. This includes projects and products that do not follow the normal authorization procedures. When the normal authorization process is not followed, one more of the projec ...
    Tags civil cost regulation usace
    Author: Groboski
    Created: 2009-12-09
  • ER 1105-2-100 Planning Guidance Notebook - Flashcards: 29

    Description: This regulation provides the overall direction by which Corps of Engineers Civil Works projects are formulated, evaluated and selected for implementation. It contains a description of the Corps of Engineers planning process, Corps of Engineers missions and programs, specific policies applicable to each mission and program, and analytical requirements.
    Popularity 0
    Tags civil cost planning usace
    Author: Groboski
    Created: 2009-12-04
  • ETL 1110-2-573 Construction Cost Estimate Civil Works - Flashcards: 24

    Description: This engineer technical letter (ETL) establishes uniform guidance to<br />describe methods, procedures, and formats for the preparation of construction cost<br />estimates, ndependent Government Estimates (IGEs), construction ontract<br />modification estimates and the Total Project Cost (TPC). The definitions and<br />appropriate policies applicable to the wide variety of projects encompassed in the Civil<br />Works Program
    Popularity 0
    Tags civil cost engineer estimate estimator usace works
    Author: Groboski
    Created: 2009-11-14