Use LEFT and RIGHT arrow keys to navigate between flashcards;
Use UP and DOWN arrow keys to flip the card;
H to show hint;
A reads text to speech;
20 Cards in this Set
- Front
- Back
IAW OPNAVINST 4790.8B, what is the maximum allowable number of items that can be listed on the Equipment Guide List (EGL)?
|
Limited to no more than a single day's work. If more than 1 day is required separate EGL's are prepared for each.
|
|
Where will you find "Warning" and "Caution" statements on the Maintenance Requirement Card?
|
Listed prior to applicable steps and/or procedural actions.
|
|
Which manual aids work center personnel in identifying/acquiring materials for planned maintenance and presents identification/supply information?
|
Standard PMS Material Identification Guide (SPMIG)
|
|
Maintenance personnel are directly responsible to and should make all reports conerning PMS to who?
|
Work Center Supervisor
|
|
When is an Equipment Guide List (EGL) required?
|
When MRC applies to two or more identical items scheduled at the same time.
|
|
On which PMS schedule will you find your name listed to show maintenance assigned to you?
|
13 Week Accountability Log.
|
|
"Special Tools" required for maintenance actions are listed on what?
|
Tools, parts, materials and test equipment block on the MRC.
|
|
Who is authorized to line out inapplicable alternate steps in the "procedure" block on a MRC?
|
Work Center Supervisor may line out non-applicable line items that do not pertain to current equipment/configuration when the step is followed with the words "if applicable" or a note identifying steps to be omitted.
|
|
What PMS document contains an inventory of all MIPs currently assigned to work center?
|
List of Effective Pages (LOEP).
|
|
When submitting a Feedback Report, who dates and serializes it?
|
3-M Coordinator
|
|
On a MIP page under related maintenance, the # sign means what?
|
There is mandatory related maintenance associated with the MRC. Maintenance requirements that must be accomplished concurrently with another maintenance requirement.
|
|
Who is responsible for the effective operation of divisional maintenance?
|
Division Officer.
|
|
Who is responsible for the effective operation of a work center?
|
Work Center Supervisor.
|
|
What is a LOEP?
|
The LOEP provides a listing of the Maintenance Index Pages (MIP) and also system equipment not requiring PMS assigned to each work center.
|
|
What does periodicity code "2W" stand for?
|
Accomplish every second week.
|
|
What does periodicity code "S" stand for?
|
Semi-Annual
|
|
(34 C1MX N) is the system control number. What does the 34 stand for?
|
3rd month, 4th year (March, 2004) of last change to MRC.
|
|
What is a FBR?
|
Feed Back Report is used to notify Fleet Technical Support (FTSC) of matters related to PMS, i.e.; technical discrepancies, shift of maintenance responsibility and Tycom assistance.
|
|
What type of feedback report deals with safety issues?
|
Urgent, when the reason for submission of a PMS FBR involves safety of personnel, ship or potential for damage to equipment and relates to the technical requirements of PMS.
|
|
On the LOEP in the adds/changes column, what symbology denotes a MIP issue change?
|
Dash (-).
|