Use LEFT and RIGHT arrow keys to navigate between flashcards;
Use UP and DOWN arrow keys to flip the card;
H to show hint;
A reads text to speech;
10 Cards in this Set
- Front
- Back
What is ORM?
|
Operational Risk Management. It is a decision making tool used by personnel at all levels to increase operational effectiveness by identifying, assessing and managing risk.
|
|
What are the three ORM process levels?
|
1. Time Critical
2. Deliberate 3. In-Depth |
|
What are the 4 principles to ORM?
|
1. Accept risk when the benefit outweighs the cost.
2. Accept no unnecessary risk. 3. Anticipate and manage risk by planning. 4. Make risk decisions at the right level. |
|
What are the 5 steps to ORM?
|
1. Identify hazards
2. Assess hazards 3. Make risk decisions 4. Implement controls 5. Supervise. |
|
What are the 3 types of ORM controls?
|
1. Engineering
2. Administrative 3. PPE |
|
What does PPE stand for?
|
Personal Protective Equipment
|
|
OPNAVINST 3500.39B
|
Operational Risk Management instruction
|
|
OPNAVINST 5100.19E
|
NAVOSH for Forces Afloat
|
|
OPNAVINST 5100.23G
|
NAVOSH for Forces Ashore
|
|
Who is the head of the Safety Council and Committee?
|
Commanding Officer.
|