Use LEFT and RIGHT arrow keys to navigate between flashcards;
Use UP and DOWN arrow keys to flip the card;
H to show hint;
A reads text to speech;
16 Cards in this Set
- Front
- Back
What directive contain information on Operational Risk management (ORM)?
|
OPNAVINST 3500.39 (series).
|
|
What is an effective provess for maintainng readiness in peacetime and achieving success in combat without infringing upon the prerogatives of the commander?
|
Operational Risk management (ORM).
|
|
What is a decision making process that enhances operational capability?
|
Operational Risk management (ORM).
|
|
What is meant by the ORM term "risk"?
|
An expression of possible loss in terms of severity and probability.
|
|
What is meant by the ORM term "hazard"?
|
A conditionwith the potential to cause personal injury or death, property damage or mission degradation.
|
|
Operational Risk management (ORM) is intergrated into what levels of a command?
|
All levels of the command.
|
|
What is meant by the ORM term "risk management"?
|
The process of detecting hazards and assessing associated risks.
|
|
What is meant by the ORM term "ORM"?
|
The process of dealing with risk associated within military operations, which includes risk assessment, risk decision making and implementation of effective risk controls.
|
|
What are the five steps of the Operational Risk management (ORM) process?
|
1-Identify hazards, 2-asess hazards, 3-make risk decisions, 4-iplement controls, 5-supervise.
|
|
What are the three ORM Process Levels?
|
1-Time critical, 2-deliberate, 3-in-depth.
|
|
What level of the ORM proess is employed by experienced personnel to consider risk while making decisions in a time-compressed situation?
|
The time critical level.
|
|
What level of the ORM process uses primarily experience and brainstorming to identify hazards and develop controls (and therefore is most effetie when done in a group)?
|
The deliberate level.
|
|
What level of the ORM process is used to more thorougly study the hazzards and their associated risk in a complex operation or system, or one in which the hazards are not well understood?
|
The in-depth level.
|
|
What are the four principles of ORM?
|
1-accept risk when benefits outweigh the cost, 2-accept no unnecesary risk, 3-accept no unnecessary risk, 4-anticipate and manage risk by planning , and make risk decisions at the right level.
|
|
What is the goal of Operational Risk management (ORM)?
|
Not to eliminate risk, but to anage the risk so that the mission can be accomplished with the minimum amount of loss.
|
|
When does a leader, responsible for executing a mission, elevate the decision to their chain of command?
|
When the leader determines that the risk associated with theat mission CANNOT be controlled at his/her level, or goes beyond the commander's stated intent.
|