Use LEFT and RIGHT arrow keys to navigate between flashcards;
Use UP and DOWN arrow keys to flip the card;
H to show hint;
A reads text to speech;
9 Cards in this Set
- Front
- Back
Catastrophic failures and major malfunctions must be repaired and upgraded to at least a partial failure within how long? |
24 hours |
|
When would the operator receive a disk full alarm on the LPE system and what actions need to be accomplished? |
-Receive when the alarm history file is almost full -Upon receiving this alarm contact the on call AECS system admin |
|
LDAOs will rotate at least every four hours and will not return to LDAO duties for at least three hours. Relief will come form a what? |
A non-sensor monitoring post |
|
What are the four types of IDS failures? |
Partial failure Major malfunction Annunciator failure Catastrophic failure |
|
The objective of sensor testing is to identify vulnerabilities in the total security caused by what? |
Hardware Degradation Improper installation Inadequate SF training Changes to the threat that can be identified, corrected or mitigated |
|
Describe PIRAMID sensor |
Uses microwave and passive infrared sensors to detect Both the motion and the body heat of a person When both the microwave and infrared sensors detect an intruder at the same time, they trip master alarm relay which provide contact closures for an alarm device or central control panel |
|
What form will be used as a cover sheet for confidential and secret material? |
SF form 704- Confidential Sf form 705- secret |
|
When will all P2 work orders be upgraded to P1 work orders |
During increased force protection condition |
|
What are the individual responsibilities under the Air Force nuclear weapons surety program |
Back (Definition) |