Use LEFT and RIGHT arrow keys to navigate between flashcards;
Use UP and DOWN arrow keys to flip the card;
H to show hint;
A reads text to speech;
37 Cards in this Set
- Front
- Back
Under what 6 inspection concepts are AF aircraft inspected? |
1. Periodic 2. Phased 3. Isochronal 4. Aerospace vehicle manufacturer 5. Programmed depot maintenance 6. Contingency decks |
|
How long is a pre flight inspection valid for on a locally flying aircraft? |
24, 48, or 72 hours (If 72 hours and aircraft hasn't flown in 48 consecutive hours another inspection is required) |
|
Which inspection is accomplished just prior to takeoff? |
End of runway |
|
What type of inspection would you perform on an aircraft that lands for refueling and plans to continue its flight immediately? |
Thru Flight |
|
When is a BPO inspection completed? |
After the last flight of a specified flying period |
|
What type of inspection determines if the aircraft is suitable for another flight? |
BPO |
|
When is an HPO inspection performed? |
After a specified number of flying hours have accumulated |
|
Which inspection does the HPO augment |
BPO which is usually done at the same time |
|
A periodic inspection includes the recurring inspection items for what 2 inspections? |
HPO or BPO |
|
What's the main objective of the phase inspection? |
To reduce out of commission time for any given aircraft. |
|
How many inspections are included in the ISO inspection concept and what are they? |
1. Major 2. Minor 3. Home station checks |
|
When are major, minor, and home station checks due? |
Major- based on the number of calendar dates from the start date of the last major inspection Minor- at completion of mission during which a specified number of calendar days accrued HSC- same as major and minor |
|
What does the minor inspection consist of? |
Checking certain components and systems to ensure that no condition exist that could result in failure before the next major inspection |
|
Describe the HSC |
Combo inspection of former HPO and BPO items |
|
If an aircraft is idle for more than 30 days, what type of inspection must be performed? |
Calendar inspection |
|
When is an acceptance inspection performed? |
When an aircraft is newly assigned |
|
3 occasions when a special inspection is required |
1. After a certain number of flying hours 2. After a specific calendar time. 3. After a specific or unusual condition occurs |
|
What 2 conditions or occasions may require installation of the replacement items listed in -6 TO replacement schedule? |
1. After a specific interval of time 2. Following the occurrence of a specific condition |
|
List the 4 basic requirements for adequate inspection facilities |
1. Adequate heat 2. Illumination 3. Ventilation 4. Communication |
|
What items should each inspection team have to perform their inspection efficiently? |
1. Applicable -6 inspection WCs, TOs, and work unit code manuals 2. Adequate hand tools and special tools. 3. Bench stock and petroleum products for servicing 4. A card bin for controlling inspection WCs. |
|
What's the primary purpose for using maintenance symbols on aircraft forms? |
To make important notations instantly apparent |
|
Hie should a symbol be entered in the symbol block for maintenance documents? |
In red from corner to corner |
|
Under what circumstances would you enter a red X in the symbol block of maintenance documents? |
When equipment is unsafe to use |
|
Which red maintenance symbol should be used to indicate that the condition of the equipment is unknown? |
Red dash |
|
What type of maintenance document entries do not require the entry of a symbol in the symbol block? |
Informational notes that don't affect flight safety or flying efficiency |
|
What types of discrepancy do not require documentation on AFTO form 781 A? |
Discrepancies resulting from battle damage |
|
What symbols can be transferred to 781 K? |
Diagonal and dash |
|
What symbol can be transferred to the 781 K? |
Diagonal and dash |
|
What's the procedure for documenting a warning note in the discrepancy block of AFTO form 781 A? |
The word NOTE in red followed by the remarks in red. |
|
When the condition requiring a warning note in the DISCREPANCY block no longer applies, what action is taken to close it out? |
Line through the note |
|
In block 13 of AFTO form 781H, how do you document fuel that is removed from the aircraft? |
In red with a - in front |
|
On AFTO form 781H, who enters their name in block 14? |
The person who performed or supervises |
|
Prior to using an equipment item, on what part of the 244 do you document the inspection of an item? |
Part 2 non scheduled inspection |
|
What part of the 244 is used to document overdue special inspections? |
Part 5 industrial/ support equipment record |
|
As a minimum, what actions must be annotated on the 95? |
Install/removal dates and component accumulated hours, reason for removal and maintenance performed |
|
What block of the 95 do you annotate the manufacturer name? |
Block 2 |
|
What documents stay with the aircraft to depot, contractor repair or when it's transferred? |
427, 781A, and 781 K |