What does 3M stand for?
|
Maintenance
Material Management |
|
What are Two Parts of 3M?
|
PMS
(Planned Maintenance System) MDS (Maintenance Data System) |
|
What 3M Manual do we use?
|
OPNAVINST 4790.4C
|
|
What does the # sign mean?
|
Mandatory Related Maintenance
|
|
What does an “O” Mean?
|
Maintenance Check Lost
|
|
What does --- Mean?
|
Denotes Changes or Additions
|
|
What does “Y” mean?
|
Yes, Parts are required
|
|
What does “N” stand for?
|
Parts not Required
|
|
What does “X” stand for?
|
Maintenance Check is Complete
|
|
What is on the LOEP
|
(List OF Effective Pages)
List of MIPs (Maintenance Index Page) |
|
What is on the MIP?
|
(Maintenance Index Page)
List of MRCs (Maintenace Requirement Card) |
|
What Manuals do we use?
|
3M
OPNAVINST 4790.4C Safety Manual for Forces Afloat OPNAVINST 5100.19D HAMAT HMUG/MSDS |
|
What does SPMIG stand for?
|
Standard PMS Maintenance Identification Guide
(It is a code on a MRC used to find a suitable replacement for a piece of test equipment). |
|
To who do you report any discrepancy about your maintenance?
|
Work Center Supervisor (WCS)
|
|
How Often does the WCS audit the Red Tag Logout?
|
Daily
|
|
TAGS
|
Yellow- Caution
Red - Danger (Departmental Work Center) |
|
What are the 3 4790/ forms?
|
4790/2K- Maintenance Attack Form
4790/2l- Supplemental Form 4790/CK- Configuration Change Form |
|
Who is the functional manager and responsible for the coordination and direct supervision of all administrative facets of the 3-M system?
|
3-M Coordinator
|
|
What are the three scheduling boards utilized for PMS?
|
Weekly, quarterly, cycle
|
|
Who is the 3M manager?
|
Executive Officer
|
|
Under which of the following circumstances should the workcenter supervisor be promptly notified?
|
-When there is anything on the MRC that you do not fully understand
-When any tools, parts or material listed on the MRC are not available -When any doubt exists about your ability to properly perform the maintenance check |
|
What does the acronym I.E.M. stand for?
|
Inactive equipment maintenance
|
|
Who reviews the weekly schedule?
|
Division Officer
|
|
Where do you look to find your daily PMS assignments?
|
Weekly PMS board
|
|
What instruction governs the 3-M system?
|
OPNAVINST 4790.4C
|
|
Who screens, serializes, dates and maintains control of all feedback reports?
|
3-M Coordinator
|
|
What form is used to document a deferred maintenance action?
|
4790/2K
|
|
Submitting a 4790/CK for a newly installed piece of equipment will initiate support to include?
|
-PMS
-Technical manuals -Cosal support |
|
How is an urgent feedback report sent out?
|
Naval message
|
|
What action should you take after completing a PMS requirement?
|
Inform your workcenter supervisor
|
|
If a MRC requires a PMS tag out, what document should be attached to the MRC?
|
Tag guide list
|
|
Who may authorize danger/caution tags
|
Anyone authorized by the Commanding Officer.
|
|
While performing maintenance checks, you discover an unsafe procedure on the MRC. After informing your workcenter supervisor, what should be submitted?
|
Feedback report
|
|
When you complete a maintenance requirement, can you “X” it off on the weekly schedule?
|
No, only the workcenter supervisor
|
|
How do you change an incorrect MRC?
|
Submit a category A feedback report
|
|
On the weekly boards, what day does the week start on and end on?
|
Monday to Sunday
|
|
Using the MRC syscom control number (48 XDST N), what does the 48 mean?
|
April 1998
|
|
What color is a Technically validated MRC?
|
Yellow
|
|
What color is a Preliminary MRC?
|
White
|
|
What color is a Classified MRC
|
Pink
|
|
Which PMS check should be conducted at least once every three months?
|
Q-1
|
|
What document describes step-by-step procedures for performing a maintenance action? (3-12)
|
MRC
|
|
You go to the MRC deck to get your maintenance card and it is not there. What do you do?
|
Immediately inform your workcenter supervisor
|
|
What does the “R” mean in M-1R?
|
Situational Requirement
|
|
Who is overall responsible for the 3-M system?
|
Commanding Officer
|
|
When hanging authorized danger tags who will accompany you?
|
No one.
|
|
For a danger/caution tag posting, what does independent review mean?
|
The checker shall not accompany the person(s) posting the tag.
|
|
What is the only block of the MRC that can be changed by maintenance personnel?
|
none
|
|
Which of the periodicity codes fall under I.E.M.?
|
SU - Start-up
|
|
What is the source of general safety precautions for forces afloat?
|
OPNAVINST 5100.19D
|
|
For the MRC syscom control number 24 DWYG Y, what does the “Y” mean?
|
Repair parts are required to perform the MRC
|
|
What is to be done with the tag-out record sheet after tags are hung and independently reviewed?
|
Kept in the work-center until time to clear.
|
|
What is the purpose of the 3-M system?
|
To provide for managing maintenance and maintenance support to help achieve maximum equipment operational readiness
|
|
If the maintenance check can be performed by memory, the MRC is not required.
|
False
|
|
Which supplemental form is used to provide amplifying information (such as drawings and listings) related to a maintenance action reported on an OPNAV 4790/2K form?
|
4790.2L
|
|
An outdated piece of equipment is removed from your workcenter. What 3-M form should be submitted?
|
4790.CK
|
|
What code on a MRC is used to find a suitable replacement for a piece of test equipment?
|
SPMIG
|
|
Where can you look to find a brief description of a MRC?
|
Maintenance index page
|
|
What two pages are necessary for you to verify a MRC?
|
LOEP and MIP
|
|
MIP
|
index of a complete set of MRC’s applicable to a system, subsystem or equipment.
|
|
EGL
|
Used with a controlling MRC when the MRC applies to a number of identical items.
|
|
LOEP
|
Provides a listing of the MIP’s and system equipment not requiring PMS assigned to each work center
|
|
TGL
|
Contains the information necessary for equipment tag-out incidental to PMS accomplishment
|
|
How often would a MRC M-2 be performed?
|
Every other month
|
|
What manual do we use for HAZMAT?
|
HMUG -Hazardous Material User Guide
MSDS- Material safety data sheet |
|
IGL final reviewer is
|
Department head
|
|
What are the letter periodicity codes:
|
A- Annually
S- Semi annually Q- Quarterly M- Monthly W- Weekly D- Daily R- as Required (situational requirement) U- Unscheduled Maintenance LU- Lay-Up Maintenance PM- Periodic Maintenance SU- Start-Up Maintenance |