• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/20

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

20 Cards in this Set

  • Front
  • Back

True or False. The method of determining air content of concrete containing lightweight aggregate is the pressure method.

False.

True or False. When making a test cylinder from concrete being used in construction, the field technician must also measure the slump of the concrete.

True

While the technician is checking the slump of the concrete, there is a decided falling away or shearing off of concrete from one side of the sample. What should the technician do?

Disregard the test and retest another portion of the sample.

Preparation of the specimens for transport includes.

Determination that at least 8 hours have elapsed since final set.

If the aggregate correction factor for a given source of fine and coarse aggregate is found to be 0.2% in a pressure air meter, and an air content value of 5.0% is read on the gage of the same air meter containing concrete with the same aggregate, what is the correct air content?

4.8%

Strength test specimens transported from the field to the testing laboratory must be.

Protected from jarring,moisture loss, freezing

Tests for the slump and air content must be started within ____ after obtaining the final portion of the composite sample.

5 minutes

The minimum size for samples to be used for strength tests is.

28L (1ft3)

True or False. After striking off of the measure used to determine density, a small quantity of concrete may be added to correct the deficiency.

False

For normal strength concretes, what temperature range must be maintained for test cylinders during initial curing?

60 -80*F

True or False. When concrete contains large aggregate, the testing technician should wet sieve the sample before making density (unit weight) test for use in yield computations.

False

When determining the temperature of fresh concrete, what is the minimum amount of concrete cover in all directions around the sensor of the temperature measuring device?

3 inches

True or False. The sides of the slump mold should be lightly tapped to consolidate the concrete in the mold.

False

True or False. Unless specified otherwise, strength test specimens molded from concrete having a slump less than 1 inch must be consolidated by vibration.

True

True or False. Test cylinders may be capped with a thin layer of Portland cement paste which is permitted to harden and cure with the specimen.

True

Start molding strength test specimens within ____ after fabricating the composite sample.

15 minutes

True or False. Representative samples are required for use in tests conducted for the purpose of determining compliance with the specifications for concrete quality.

True

True or False. Test Method C172/C172M specifies a minimum time required for inverting and agitating the meter to free concrete from the base.

True

True or False. It is acceptable to fabricate a test specimen from the same concrete used for the air content test.

False.

According to test method C138, what is the air content (in percent) of the following concrete batch.



The theoretical density computed on air free basis is 168 lb/ft3



The density is 158 lb/ft3

6% = [(168-158)/168]×100