Use LEFT and RIGHT arrow keys to navigate between flashcards;
Use UP and DOWN arrow keys to flip the card;
H to show hint;
A reads text to speech;
15 Cards in this Set
- Front
- Back
the temperature of concrete may be mixed in a wheelbarrow? True or False
|
True
|
|
The Sensor of the temperature measuring device shall have at least ____ in. ____mm of concrete cover in all directions
|
3 in, 75 mm
|
|
The temp measuring device shall have a capacity of measuring temp of freshly mixed concrete to +/- ____ degrees F ____degrees C throughout a range of ____ to ___ degrees F (____to____degrees C.)
|
1* F (.5*C), 30*,120, [0, 50]
|
|
The temp measuring device shall be calibrated _____, or whenever there is a question of _____.
|
Annually; Accuracy
|
|
The temp of concrete may be measured in a wall form?
|
True
|
|
A composite sample of concrete is required even if teh only purpose for obtaining the sample is to determine temperature?
|
False
|
|
What must be done to the sample container prior to sampling the concrete?
|
Dampen (with water)
|
|
What must be done to the concrete surrounding the temp device after the device is submerged in the fresh concrete
|
Press the concrete around the temp device at the surface of the concrete
|
|
How long must the temp device remain in the freshly mixed concrete for an accurate reading?
|
2 minutes or until the temp reading stabilizes.
|
|
After the temp of the concrete is read, what is then required?
|
Recording of temp
|
|
Complete the temp measurement of freshly mixed concrete within _____ minutes after obtaining the sample.
|
5
|
|
The temperature of the concrete is recorded tot he nearest ___ degree F [___ degree C]
|
1, 0.5
|
|
According to ASTM 1064, what is one reason to take the temp of concrete?
|
verify conformance to a specified requirement for temp of concrete
|
|
A max temp of freshly mixed concrete is specified in ASTM 1064. True or False?
|
False
|
|
What special procedures are required when taking the temp of concrete containing large size course aggregate (over 3in. [75 mm[)?
|
May require a longer period of time, up to 20 minutes for the transfer of heat from the aggregate to the mortar
|