- Front
- Back
Over due inspections |
Back (Definition) |
|
Over due inspection recommendations |
Back (Definition) |
|
Plate lining |
Back (Definition) |
|
Owner/user |
|
|
Post weld heat treatment PWHT |
|
|
Pressure boundary |
|
|
Pressure test |
|
|
Pressure vessel |
|
|
Pressure vessel engineer |
|
|
Procedures |
|
|
Quality assurance |
|
|
Quality control |
|
|
Repair |
|
|
Repair organization |
|
|
Required thickness |
|
|
Rerating |
|
|
Risk-based inspection |
|
|
Scanning nondestructive examination |
|
|
Same or similar service |
|
|
Strip lining |
|
|
Temper embrittlement |
|
|
Temporary repairs |
|
|
Testing |
|
|
Tightness test |
|
|
Transition temperature |
|
|
ASME code |
ASME Boiler and pressure vessel code including its addenda and code cases |
|
CML |
Condition monitoring location |
|
CDW |
Controlled deposition welding |
|
CUI |
Condition under insulation |
|
E&P |
Exploration and production |
|
ET |
Eddy current examination |
|
FFS |
Fitness for service |
|
GMAW |
Gas metal arc welding |
|
GTAW |
Gas tungsten arc welding |
|
IOW |
Integrity operating window |
|
MAT |
Minimum allowable temperature |
|
MAWP |
Maximum allowable working pressure |
|
MDMT |
Minimum design metal temperature |
|
MOC |
Management of change |
|
MT |
Magnetic particle examination |
|
NDE |
Nondestructive examination |
|
PMI |
Positive material identification |
|
PT |
Liquid penetrant examination |
|
PWHT |
Postweld heat treatment |
|
QA |
Quality assurance |
|
QC |
Quality control |
|
RBI |
Risk based inspection |
|
RT |
Radiographic examination |
|
SMAW |
Shielded metal arc welding |
|
UT |
Ultrasonic examination |
|
WPS |
Welding procedure specification |
|
An owner/user of pressure vessels shall exercise control of the vessel and |
|
|
The owner/user inspection organization shall also control |
|
|
An owner/user organization is responsible for |
|
|
These system and procedures will be contained and maintained in a quality assurance (QA) inspection/repair management system and shall include at least the following |
|
|
Management shall have an appropriate requirement and work process to insure |
|
|
management OF CHANGE (MOC) The owner/user is responsible for implementing and executing an effective |
|
|
An effective MOC review process is vital to |
|
|
When pressure equipment integrity may be affected the MOC process shall include |
|
|
Changes to the hardware and the process shall be included in the MOC |
|
|
Integrity operating windows (IOW) the owner/user should implement and maintain an effective |
|
|
IOWs are implemented to avoid |
|
|
Future inspection plans and intervals have historically |
|
|
Without an effective IOW and process control program there often is no |
|
|
Deviations from and changes of trends within established IOW limits should be brought to the attention of |
|
|
IOWs should be established for process parameters (both physical and chemical) that could impact |
|
|
Examples of the process include |
|
|
Particular attention to monitoring IOWs should also be provided during |
|
|
Engineer The pressure vessel engineer is responsible to the owner/user for activities involving |
|
|
Repair Organization. All repairs and alterations shall be performed by a qualified |
|
|
The repair organization is responsible to the |
|
|
Inspector. The inspector is responsible to the owner/user to |
|
|
The inspector shall be directly involved in the inspection activities especially |
|
|
However all NDE results shall be evaluated and accepted by the |
|
|
Inspectors shall be certified in accordance with |
|
|
Examiners. The examiner shall perform the NDE in accordance |
|
|
The examiner does not need API 510 inspector certification and does not need to be |
|
|
The examiner does need to be trained and competent in the NDE procedures being used and |
|
|
Examples of certification that may be required include |
|
|
Inspectors conducting their own examinations with NDE techniques shall also |
|
|
The examiners employer shall maintain |
|
|
These records shall be available to the inspector who is responsible to the owner/user to determine that all |
|
|
Other Personnel. Operating, maintaining, engineering (process and mechanical) , or other personnel who have special knowledge or expertise related to particular pressure vessels shall be responsible for |
|