The Subletting and Subcontracting Fair Practices Act means a prime contractor must list every sub on the bid over what percentage of the work?
|
1/2 percent
|
|
If a prime fails to list a sub what happens?
|
The prime must self perform that scope
|
|
How long does a subcontractor have to respond if they have been notified they will be replaced on a public contract due to the prime's requesting substitution?
|
5 days
|
|
Any prime contractor in violation of the SSFPA is subject to what disciplinary action?
|
1) Cancellation of contract
2) Penalty up to 10% of the amount of the subcontract 3) disciplinary action against their license |
|
Performance bonds protect the owner from what?
|
Project being completed not according to plans and specs
|
|
Payment bonds protect the owner from what?
|
Mechanics liens
|
|
Contract bonds protect the owner from what?
|
From the contract not being completed and all labor and materials being paid for.
|
|
Umbrella policies cover what?
|
Major lawsuits above and beyond other policies
|
|
Vehicle insurance covers what?
|
To protect the contractor from losses associated with traffic accidents and vehicles
|
|
Builder's risk primarily insures against what?
|
Fire, theft, vandalism, storm, and general building problems.
|
|
General Liabilirty coverage insures damage to owner's property caused by poor workmanship. Does it also cover the poor workmanship?
|
NO
|
|
A contractor installs a new ceiling fan in a residence. The ceiling fan falls and damages the hardwood floor underneath? The hardwood floor will be covered by whose insurance, and whose insurance will cover the fan?
|
The hardwood floor is covered by the Contractors CGL but thefan is the contractors fault due to poor workmanship.
|
|
How many calendar days before a nonserious complaint must be investigated by DOSH
|
14 days
|
|
Toolbox meetings must be held every __ days
|
10 days
|
|
What is HESIS
|
Hazard Evaluation System and Information Service
|
|
What is the CAL/OSHA Form 300?
|
A log of all work related injuries
|
|
How many employees must you have to keep a Form 300 CAL OSHA?
|
10
|
|
How long must CAL OSHA Form 300 logs be kept?
|
5 years
|
|
All occupational injuries which must be reported are to be submitted on Cal/Osha Form 5020 within ___
|
5 days
|
|
A contractor who works on a building built before ____ must inquire if asbestos is present.
|
1978
|
|
What sheets must be delivered with Hazardous materials?
|
MSDS
|
|
How long does the employer have to report a serious injury
|
immediate, but no more than 8 hours
|
|
A qualifying individual can never qualify for more than how many businesses at a time?
|
3
|
|
The RME must work at least how many hours a week?
|
32( or 80% of the operating time of the business, whichever is less).
|
|
For a RME to haold more than one license they must own what % of each company.
|
20%
|
|
What does SWIFT stand for?
|
State Wide Investigative Fraud Team
|
|
How much operating capital must a someone applying for licensure demonstrate?
|
$ 2500.00
|
|
If a qualifying individual leaves the license, they must be replaced within ___ time.
|
90 days
|
|
If the name or address of a business changes, how long do you have to notify the registrar?
|
90 days
|
|
A bond of how much must be applied for when a new license becomes active?
|
$12,500.00
|
|
Bonds must be submitted within how many days of the effective date of the bond?
|
90 days
|
|
The contract notice must be included in all what type of contracts?
|
Prime contracts
|
|
Contractors should collect the price of a change order when?
|
When the change order is complete and not wait until the end of the entire job.
|
|
Small claims court is for claims in the amount of ____$ or less
|
7500$
|
|
The preliminary notice does what?
|
Makes the owner aware work is being done which could allow a lien to be filed if not paid.
|
|
What is a stop notice?
|
A lien on funds
|
|
If a prime contractor has a sub with no worker's comp and an injury happens, who is liable for the injury?
|
The injured employee could file a lawsuit against BOTH the prime and the sub
|
|
Who enforces CAL/OSHA standards?
|
DOSH
|
|
Who adopts amends and repeals safety standards?
|
The Occupational Safety and Health Standards Board
|
|
Who hears appeals of safety citations, orders, abatement periods, etc.
|
OSH appeals board
|
|
Cal/OSHA consultation service does what?
|
Provides free onsite safety consultation services
|
|
How long does DOSH have to investigate a nonserious violation?
|
14 days
|
|
A contractor's gross profit for a project is determined by ?
|
Amount of contract - direct costs - indirect costs = gross profit
|
|
A safe load for a 5/8" manila rope, taking the safety factor into consideration, and that the top may be old, worn, damaged, etc. is:
|
600 lbs
|
|
A safe unobstructed means of access, such as a walkway, stairs or ladder shall be provided to all scaffold platforms that are:
|
18 inches
|
|
An employer can require, under certain circumstances, his employees to work as many as ______________ days after which they will be due to get the number of days off they would normally receive in that period of time.
|
21
|
|
An employer who has a good record with no unemployment claims against his reserve fund will automatically qualify for a lower unemployment tax rate after ____ years.
|
3
|
|
An income journal always consists of:
|
credits and debits of equal value
|
|
An owner of property may act as a contractor or owner/builder but without a license he is restricted to building:
|
two structures during any three year period.
|
|
An owner posting a Notice of Non-Responsibility has _______ days to record and post the notice after finding the work being performed.
|
10
|
|
Before SIGNING a home improvement contract, the owner is responsible for reviewing all plans and specifications with the:
|
contractor.
|
|
Excavations in which the average depth exceeds the width and the width is ____ feet or less at the bottom are called trenches.
|
15
|
|
Extension ladders should have adequate overlap between sections. A 36 ft. ladder should have a _____ ft. overlap.
|
4 ft
|
|
First aid materials are required at:
|
all construction locations.
|
|
Fixed assets are usually shown on the balance sheet as:
|
cost less depreciation.
|
|
If a worker gets chemicals on his/her skin or eyes he/she should bathe the exposed area for:
|
15 minutes.
|
|
If a license has expired, it may be renewed by filing an application for renewal within ________years after the expiration date.
|
3 yrs
|
|
If a license is issued to a partnership, the qualifying partner:
|
(Correct Answer) cannot do work on his own outside the partnership.
|
|
If constructing a wood frame building, what safety gear would be most likely needed?
|
(Correct Answer) Safety glasses, a hard hat and safety shoes
|
|
If the employer monitors the work space air when chemicals are present in order to determine the level of airborne contamination:
|
(Correct Answer) the employee may observe this monitoring.
|
|
In order to find a quick ratio, a banker must:
|
(Correct Answer) deduct inventories from total current assets and divide by total current liabilities.
|
|
- Specifications of the manufacturer regarding design, erection, operation and safety must be available at the job site. All cranes exceeding ____ ton capacity need to be certified how often?
|
(Correct Answer) 3 - annually for tower cranes
|
|
Labor performed between the 16th and the last day of the month shall be paid for:
|
(Correct Answer) between the 1st and 10th days of the next month.
|
|
Nozzle guards for airless spray guns:
|
Correct Answer) extend the minimum distance between free hand and nozzle orifice.
|
|
On suspension (swing) scaffolds, the width of platform must be no less than __________ no more than ___________.
|
(Correct Answer) 14"; 36"
|
|
Prior to digging excavations or trenches, the location of the underground utilities should be determined and given to the owner _____ hours in advance.
|
48
|
|
The Sales and Use Tax Act of California is administered by:
|
(Correct Answer) the Board of Equalization
|
|
Truth in Lending Act rescission rights apply when:
|
(Correct Answer) a nonpurchase lien or security interest is taken in the consumer's principal dwelling.
|
|
When a contractor is working on a home improvement project and encounters exposed asbestos materials, the contractor should:
|
(Correct Answer) stop work and inform the owner
|
|
When the owner does not file a notice of completion, a subcontractor who has served the Preliminary Notice on time and now wishes to file a claim of lien must do so within ________ days following the completion of the structure.
|
Correct Answer) 90
|
|
Which are safer in terms of fire safety: low flash solvents or high flash solvents
|
high flash solvents
|
|
__________ of the contractor members shall be General Building Contractors.
|
2
|
|
According to Cal/OSHA, the ground within ____ of buildings under construction should be kept reasonably free of irregularities
wherever it is practicable. |
6 ft
|
|
A company has just purchased its own building; depreciation must be calculated using:
|
(Correct Answer) the 31.5 year straight line.
|
|
A contractor estimates the direct costs for a project at $17,000. The project overhead expenses are generally 20 percent of the
direct costs. In order to make 20 percent profit on this project, the bid must be: |
25,550
|
|
A contractor is currently building an addition on an office building. The building was built in 1976. Which of the following
statements is MOST true, according to the "Handicapped Access" Laws? |
(Correct Answer) Only the addition needs to be handicapped accessible and a "path of travel" to the remodeled area is generally
required. |
|
A CPA advises a contractor to set up a cost management system. What will this program provide?
(Incorrect Answer) It shows where profits and losses are. |
Correct Answer) It gives a cost history for use in order to analyze labor and material costs.
|
|
A developer purchases a small parcel of underdeveloped land for $750,000 according to the following terms: $100,000 in cash
with a mortgage of $650,000 payable in full in 5 years, with interest at 10 percent payable quarterly. How much cash will this contract cost the purchaser, when the contract is closed? |
(Correct Answer) 100000
|
|
Double cleat ladders must not exceed ____ feet in length.
|
30 ft
|
|
A materialman is exempted from serving the preliminary notice if:
|
his invoice for the job contains all of the required information.
|
|
A worker is considered an employee rather than an independent contractor if:
|
Correct Answer) the worker is definitely instructed as to how to proceed with each facet of the work.
|
|
All contractors, new and old, must furnish a ________ bond or cash to be on file with the Registrar in order to maintain a valid
license. |
12,500
|
|
An employee earns $15.00 per hr. and works 50 hrs. in one week. The pay for overtime is equal to time and a half; what are
the gross wages earned by this employee? |
825.00
|
|
An owner can protect himself against being liened for more than the contractual price by having his contract with the contractor
recorded with:\ |
the County Recorder.
|
|
Cases of complaints against licensees that are contested by contractors are heard by:
|
the Registrar.
|
|
FICA (Social Security Taxes) are levied on:
|
both employers and employees.
|
|
Frequently traveled passageways, entries or exits must have a method of access installed at all points where there is a break in
elevation of _____ inches or more. |
18
|
|
Henry Collins, the RME for Johnson Construction Co. also has his own construction business which he operates under a
different name and license number on weekend remodeling jobs. Is Mr. Collins operating in a legally permissible manner? |
No, Collins can qualify for only the Johnson Const. Co.'s License.
|
|
If a contractor does not wish to furnish a bond or cash to the Registrar:
|
ncorrect Answer) None of the above
(Correct Answer) he can make arrangements with a bank or S&L to furnish a guarantee to the Registrar for the necessary amount. |
|
- If you are self-employed, FICA tax is:
|
paid at the rate set by the government for the year in which profit was earned.
|
|
In a licensed partnership, if any of the partners wish to terminate the partnership:
|
any of the partners can do so by writing to the Registrar.
|
|
Management should have meetings of all foremen relative to safety problems and results:
|
monthly.
|
|
The Contractors' State License Board requires an applicant to have a knowledge of the contracting business and to show _____
years of experience in his/her trade or trades before approval for a license. |
4
|
|
The Board is composed of:
|
7 public members, 5 contractor members and 1 labor member.
|
|
The Board must have at least _____ regular meetings each year.
|
4
|
|
The California Unemployment Insurance Act is administered by:
|
the Department of Employment Development.
|
|
The difference between the General Ledger and the General Journal is that the journal:
|
Correct Answer) includes monthly adjustments, accruals and reversals of previous accruals, corrections, non-cash expenses and
any other entry that is not a receipt or a payment. |
|
The logical source from which to obtain the amount and percentages of overhead is the:
|
Correct Answer) income and expense statement (profit and loss statement).
|
|
The State's share of the Sales or Use Tax is:
|
7.25
|
|
To enforce a stop notice, the contractor may not file a lawsuit before __________ days from serving the stop notice or after
__________ days from the expiration period for filing liens. |
10 - 90
|
|
What document must an owner have with him/her when doing a walk-thru on a completed job?
|
Specifications and plans
|
|
What is the maximum height of a stepladder?
|
20 ft
|
|
When is an engineer necessary for a home improvement job?
|
When a building official requires that documents be prepared by an engineer, he may also require an engineer
to be on site |
|
Which bond is most beneficial to a homeowner who is having remodeling work done on his residence?
|
Performance Bond
|
|
You have prepared a bid which enables you to make a profit, however the customer cannot afford it. What should you do?
|
Do not change your bid unless the scope of the job is reduced
|
|
Which of the following forms enables an employer to know how many deductions an employee is claiming?
|
A W-4 form
|
|
While they are serving on the Board, the contractor members:
|
Correct Answer) must remain active as contractors.
|