• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/116

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

116 Cards in this Set

  • Front
  • Back
What are two ways to impound funds?
DEFERALS
Temporary
Must report to Congress
RECISSIONS
Must report to Congress
If no action in 45 days; must be made available
What does a direct MIPR need before obligation?
A signed contract.
When can an obligation be recorded?
When there is documentary evidence of the transaction.
What are the Appropriation life cycles?
MILPERS 1
O&M 1
RDT&E 2
Procurement 3
MILCON 5
SCN 5
What is the Necessary Expense Doctrine?
The Purpose part of PTA
What are the 3 tests of Purpose?
Logical relationship to the appropriation
Not prohibited by law
Not funded elsewhere
What is the systematic approach to choosing the best method of allocating scarce resources to achieve a given objective?
Economic Analysis
What are the steps necessary to conduct an effective Economic Analysis?
Identify constraints
Determine alternatives
Identify cost/benefits of each alternative
Compare alternatives
Perform a sensitivity analysis
Report results
What are some limits of EA?
GIGO
Cannot make final decisions
No cookbook precision
Cannot provide relevant solutions to irrelevant problems
Cannot predict political or non-economic impacts
Not a substitute for sound judgement
What are the 3 linking factors critical to the sucess of any EVMS?
Cost
Schedule
Performance
What cost structure does MIL-HDBK-881 represent?
Defines the general WBS elements by commodity
What happens at Milestone B?
Where program initiation occurs
The MILDEP or Agency is required to have funds in the FYDP
What concept is based on the axiom that the best time to reduce costs is early in the process?
CAIV
Advance procurement is an exception to what principle?
Full Funding
What is the title of the final document of the Planning Phase?
JPG
Who serves as the chair of the National Security Council?
POTUS
Under the Economy Act agreement, what must be done with funds that are unused when the ordering appropriation expires?
Returned to the sender
What document provides guidance to the components regarding the best mix of forces and resources to achieve objectives?
Joint Programming Guidance (JPG)
When is the QDR due?
February of the second year of a presidential administration.
What is the intent of the Integrated Priority List (IPL)?
Provide visibility to the key priorities of the Combatant Commanders
What is submitted in odd years ILO a POM?
A Change Proposal
- Must net to 0
- Only require action in off year
What is the SLRG?
The Senior Leaders Review Group
The DoD's Board of Directors
What does the Budget do?
It translates the Program into an Appropriations format.
When is the BES submitted?
September of even years
The USD(AT&L) serves as the chair of what board?
DAB
What comprises the BES?
The POM w/o the outyears
1 prior
1 current
2 budget
In what years are CPs submitted?
Odd years
When is the POTUS required to transmit the budget to Congress?
1st Monday in February
When is the 1st concurrent resolution due?
15 April
WHAT does the 1st concurrent resolution do?
Fixes budget authority and sets outlay targets
Establishes targets for public debt
Develps allocation of budget to each committee

(Does not go to POTUS)
What is the difference between Budget Cost of Work Performed and Actual Cost of Work Performed?
Cost Variance
What does a direct MIPR need before obligation?
A signed contract
What does the Joint Strategic Planning examine?
The global security situation
What does the Chairman's Program Assessment (CPA) do?
Compares the POM/CP with the Issue Books.
The Director PA&E analyzes the POM/CP and creates what?
Issue Books
Who develops the National Defense Strategy?
SECDEF
Who develops the National Military Strategy?
Chair of the Joint Chiefs
Who develops the Strategy for Homeland Defense and Civil Support?
SECDEF
What is the final output of the PPBE?
Submission of the budget to the POTUS for approval and to Congress for authorisation & appropriation.
What does correlation measure?
The degree of relationship between variables.
Criteria for inclusion into a DWCF?
1. ID of outputs
2. Establish a cost accounting system
3. ID of customers
4. Evaluation of buyer's-seller's advantages/disadvantages.
When is the FYDP updated?
Twice in even years
- POM/BES
- PresBud
Once in odd years
- PresBud
What financial control document is issued by the Treasury Department following signature of the Appropriations Act?
A warrant.
Key role of the Chairman Joint Chiefs?
Military advisor to POTUS
What is the FYDP?
An automated database that summarizes all forces,resources, and equipment.
Who is responsible for central control and management of the FYDP?
Director, Program Analysis and Evaluation (DPA&E)
What is the duration of MILCON?
5 years unexpired; 10 total
What is the duration of RDT&E?
2 years unexpired; 7 total
What is the duration of SCN?
5 years unexpired; 10 total
What is the duration of PROC?
3 years unexpired; 8 total
Purpose of the PPBE process
allocate resources within the Department of Defense
Key role of the SECDEF?
Develops National Defense Strategy and Strategy for HD and CS.
What is the QDR?
Quadrennial Defense Review.
Drafted every 4 years following presidential election.
Draw from NDS, NMS,HD and CS.
Key roles of the Chairman, Joint Chiefs?
Military advisor to POTUS, NSC, and SECDEF
Budget estimates are reviewed by who?
USD (C) and OMB
Final document of the planning phase?
JPG
What preceeds PDM in programming phase?
POM submits
In what years is the POM prepared?
Even years
Change Proposals (CPs) are performed in what years?
Odd years
What is comprised of one page outlines of proposed major issues?
Issue books
Checks balances and capabilities of force and support levels recommended by service POMs?
Chairmen's Program Assessment
Helps SECDEF make program decisions reflected in the POM?
Chairmen's Program Assessment
Issuance of this document completes the programming phase?
Program Decision Memoranda
Provides detailed synopsis for the preparation of biennial budget estimates?
DoD FMR 7000.14R
Docs submitted in even number years?
BES
Provides detailed synopsis for the preparation of biennial budget estimates?
DoD FMR 7000.14R
Docs submitted in odd number years?
CPs
Who is responsible for PBD?
USD(C)
What is the FYDP?
An automated database that summarizes all forces, resources and equipment.
What is the purpose of PBDs?
Reflect SECDEF decisions regarding program and funding to be included in annual defense budget.
What's in the BES?
PY, CY, BY, BY
When is the BES modified?
Submitted to OSD in September of each even numbered year.
Who is responsible for central control and management of the FYDP?
Director, Program Analysis and Evaluation (DPA&E)
Who coordinates the annual program review?
DPA&E
What are the phases of the Federal Budget Process?
Budget Formulation - Congressional Action - Budget Execution - Review & Audit
When is the PRESBUD due?
Due to Congress NLT 1st Monday in February.
What is normally transmitted to Congress as request to provide funds in addition to amounts already appropriated?
Supplemental
What is the due date to House and Senate Budget Committees for all Congressional committees on their respective views and estimates?
15-Mar
What is a continuing resolution?
Temporary appropriation act that dissolves when a regular appropriation is enacted
Who must request apportionment?
OSD
What is a deferral?
postponement of funds
What is a rescission?
The cancellation of funds
Within how many days must an agency request apportionment?
Within 10 days
The most common type of obligating document is?
contract
what is the most universal form for requesting work or services from another government entity?
MIPR
What is a rescission?
The cancellation of funds
What is the duration of MILCON?
5 years unexpired, 10 total
The most common type of obligating document is?
Contract
What is the duration of RDT&E?
2 years unexpired, 7 total
What is the duration of SCN?
5 years unexpired, 10 total
What is the duration of PROC?
3 years unexpired, 8 total
When did WCF get established?
National Security Act of 1947
What are funds appropriated but not yet apportioned by OMB?
Unapportined appropriations
What are funds apportioned by OMB but not yet alloted by DoD?
Unalloted apportionments
What is a working capital fund?
A revolving fund designed to breakeven
What is a systematic approach to the problem of choosing the best method of allocating scarce resources to acheive a given objective?
Economic Analysis
When is economic analysis required?
>$1M
When is a cost estimate required?
<$1M
What are the 3 measures of central tendency?
Mean, Median, Mode
What is the formula for discounting?
PVF = 1/(1+d)^n
What is a systematic approach to choosing best method of allocating scarce resources to achieve a given objective?
Economic Analysis
cost structure MIL-HDBK-881
Work breakdown structure
What cost estimating approach is based on direct comparison with historical info?
Analogy
What is the cost estimating approach known as a statistical method or top down approach?
Parametric
What indicates that the best time to reduce cost is early in the process?
Cost as An Independent Variable (CAIV)
This cost estimating approach requires extensive knowledge of the product or process.
Engineering or "Bottom Up"
Advance procurement is an exception to what technique?
Full funding
What is the difference between budget cost of work performed and actual cost of work performed?
A cost variance
What is a radical redesign of key business processes that involves examination of the fundamental process itself?
Business process innovation or reengineering
How many players should be on a business process reengineering team?
Less than 10
After the Appropriation is signed into law, the DoD requests what from OMB?
Apportionment.
What is the purpose of the Programming Phase?
To translate planning decisions, programming guidance, and Congressional guidance into a detailed allocation of resource requirements.
What are the elements of the POM?
A systematic analysis of mission objectives to be achieved
Alternative methods of accomplishing objectives
Allocation of resources

(Even years only)
On 15 Nov each agency head must submit what?
Performance Report
How often must 5-year strategic plans be updated for nonDoD? For DoD?
Non = 3 years
DoD - 4 years (QDR)
What are some misc. sources of funds for the DoD?
Agricultural and grazing leases
Recycling
Sale and outlease
Fish and wildlife conservation program
Energy savings