Disposal of sewage, or other liquid wastes, shall be by means of _____________________.
|
The drainage system of the building or premises
|
|
A drinking fountain installed outside shall be connected to an approved drainage system. T/F
|
True
|
|
A connection to the public sewer, or private sewer disposal system, is required for ___________________.
|
Buildings with plumbing fixtures
|
|
Roofs, inner courts, vent shafts, light wells, or similar areas having rainwater drains shall discharge to (a) ___________________________.
|
Outside of the building or to the gutter
|
|
Burred ends of all pipe and tubing shall be ______________________.
|
Reamed to the full bore of the pipe or tube
|
|
No plumbing system, drainage system, building sewer, private sewage disposal system, or parts thereof, shall be located in ___________________________.
|
Any lot other than the lot that is the site of the building served by such facilities.
|
|
Piping, fixtures, or equipment that are installed so that they interfere with normal operation and use of windows or doors shall be ________________.
|
Relocated to avoid interference
|
|
All design, construction, and workmanship shall be in conformity with ____________________.
|
Accepted engineering practices
|
|
When supporting horizontal piping 5-inches in diameter with hangers, a ____ inch diameter rod shall be used.
|
1/2
|
|
The building drain from the front of the building or structure and paralleling the same shall be at least ________________________.
|
On an interior lot (when driveway cannot be used)
|
|
All trenches deeper than the footing of any building or structure and paralleling the same shall be at least ____________________.
|
45 degrees therefrom
|
|
Cast-iron soil pipe, installed vertically, shall be supported at its base and ___________________.
|
Each floor, not to exceed 15 feet
|
|
Threaded pipe (I.P.S.), 3/4 inch, except for gas piping, installed horizontally shall be supported at approximately ___________________.
|
10-foot intervals
|
|
Piping in the ground shall be laid on _______________________.
|
A firm bed
|
|
PEX piping may be coupled together with shielded couplings. T/F
|
False
|
|
The type of acceptable joints for PEX shall be __________________.
|
Metal insert or metal compression
|
|
Copper tubing installed vertically shall be supported at each story or at maximum intervals of _____________________.
|
10 feet
|
|
Mechanical devices may be used to complete backfilling where covering above any piping is at least _____ inches.
|
12
|
|
Two-inch horizontal copper tubing drain pipe shall be supported at ____________________.
|
10 foot intervals
|
|
Horizontal hubless pipe shall be braced at not more than 40-foot intervals to prevent ________________________.
|
Horizontal movement
|
|
All piping, fixtures, and equipment shall be adequately supported in accordance with the ______________.
|
Code
|
|
Voids around piping passing through concrete floors on the ground shall be ____________________.
|
Sealed
|
|
All materials, fixtures, or devices used or entering into the construction of plumbing and drainage systems shall _______________________.
|
Conform to approved applicable standards.
|
|
The provisions of the code allow an alternate material or method of construction provided it is ______________________.
|
Approved by the Authority Having Jurisdiction as an alternate
|
|
I.P.S. is the abbreviation for ______________________.
|
Iron Pipe Size
|
|
Pipe joint material shall be insoluble in water, nontoxic, and applied ___________________.
|
On male threads only.
|
|
Wiped joints are permitted with ___________________.
|
Lead
|
|
Section 313.2 prohibits the direct embedment of hubless cast-iron in a concrete slab. T/F
|
True
|
|
Tub waste openings in framed construction shall be protected by ____________________.
|
Metal collars or screens
|
|
Surfaces to be joined by soldering or brazing shall be cleaned bright by ______________________.
|
Mechanical or manual means
|
|
Closet bends or stubs shall be cut off so as to present a smooth surface, even with the ____________________.
|
Top of closet ring
|
|
Solder and fluxes used in piping systems conveying potable water are prohibited when the lead content exceeds ______________________.
|
0.2 of 1 percent
|
|
Joints at the roof, around pipes, shall be made water tight by the use of _________________________.
|
Flashing material
|
|
The minimum wall thickness for threaded plastic pipe shall be ___________________.
|
Schedule 80
|
|
Wall-mounted water closets shall be securely bolted to ____________________.
|
A carrier fitting
|
|
It is permitted to drill and tap a vent pipe to connect an indirect waste pipe. T/F
|
False
|
|
Fixture connections between drainage pipes and water closets shall be made with _________________.
|
Flanges
|
|
All pipe, pipe fittings, traps, fixtures, materials , and devices used in plumbing systems shall be __________________________.
|
Approved by the Authority Having Jurisdiction
|
|
Sleeves shall be provided to protect all piping through _____________ and ______________.
|
Concrete; Masonry
|
|
In seismic zones 1 and 2, hubless cast-iron piping 5 inches or larger suspended in exposed locations over high traffic areas, and over four feet in length, shall be provided with support on both sided of the coupling. T/F
|
True
|
|
When installing __________________, the Authority Having Jurisdiction shall require evidence of the competency of the installers.
|
Medical gas piping
|
|
When brazing, the alloys shall have a melting temperature of at least ____________ degrees F.
|
1,000
|
|
Drain pipes subject to condensation over food storage in food-handling establishments shall be _______________________.
|
Thermally insulated
|
|
The section of the UPC that grants the Authority Having Jurisdiction the opportunity to require tests as proof of equivalency.
|
301.2.1
|
|
Test gauges shall not have a pressure range more than _______________ the test pressure.
|
Twice
|