• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/9

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

9 Cards in this Set

  • Front
  • Back

Met Office

Weather office


People that forecast what the weather will be like

Defra

Government organisation/government funded


Pay for sea defences


Prevents coastal flooding and erosion



(County) council

eg. Northampton borough council


Similar to Defra


Help with building planning

Environment Agency

Give warnings


Type of floods, where, time, possible damage

UK

- 2.1 Million properties at risk of flooding


- Nearly 50% of these properties at risk of sea flooding


- If sea levels rise, the risk of flooding will increase

CASE STUDY

- 1953, night of 31st January


- 4 major factors linked to form a terrible tragedy


- A very deep depression passed North Britain causing sea levels to rise 0.5m


- Storm winds drove a wall of water southwards


- Full moon spring tide


- Rivers discharging floodwaters into the sea

CASE STUDY - stats

- 300 deaths in Eastern England


- 24 000 houses destroyed


- 30 000 people evacuated


- Thousands of animals evacuated


- 1000km² farmland made infertile by salt water


- Sea defences destroyed

Thames Barrier

- Built as a result of 1953 floods


- Gates work by rotating


- Tested monthly


- To close = £16 000


- Then costed £5 million, now'd be £1.3 billion


- Built to prevent floods in London

Thames Estuary

- Built to prevent tidal flooding


- Built to work for the next 80+ years


- Work began in 2002


- Protects £200 billion of property in London


- Flood walls, areas of open space