25 Cards in this Set
- Front
- Back
what are the three design phases
|
schematic design
design development construction documents |
|
what factor contributes to an effective team
|
partnering
|
|
what are the three project conception phases
|
programming
planning pre-design |
|
this person should be retained as a special consultant by the _______
|
commissioning agent
owner |
|
who validates the stages of the project and is involved from conception
|
commissioning agent
|
|
are schematic design documents fully developed
|
no
|
|
when are cost estimates prepared
|
at the conclusion of each design phase
|
|
who prepares cost estimates
|
a/e
|
|
what is the quickest and least accurate cost estimate
|
order of magnitude
|
|
what cost estimate provides more detailed info
|
assemblies/systems
|
|
materials that are relatively generic (brick, concrete, steel, limber)
|
commodities
|
|
basic designed products that manufacturers produce
|
standard products
|
|
products with non-standard characteristics
|
custom products
|
|
unique high performance materials without comparative competitive products
|
proprietary products/systems
|
|
solicitation for procurement is also known as an
|
invitation to bid
|
|
instructions for procurement are also known as
|
instructions to bidders
|
|
contractor submits his bid through bid forms/proposal forms or they are also known as
|
procurement forms
|
|
what is the contracting form
|
the agreement
|
|
division 1 is also known as
|
the general requirements
|
|
the transition from the bidding design phase to the construction stage is the bidding/negotiating/purchasing stage and is collectively known as
|
procurement
|
|
a request for compensation for dealing with a situation that differs materially from what was anticipated by the parties at the time of entering into the contract
|
claim
|
|
claims that cannot be resolved without intervention
|
disputes
|
|
type of bond that protects the owner from losing the benefit of an accepted bid
|
bid bond
|
|
type of bond that guarantees that if the contractor defaults, the surety will either complete the project or provide sufficient funds
|
performance bond
|
|
type of bond that guarantees that people working on the project will be paid
|
payment bond
|