• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/59

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

59 Cards in this Set

  • Front
  • Back

Code 01

Potholes - 3 days

Code 02

Alligator Cracks - 3 days

Code 03

Major Scaling 30 days

Code 04

Shoving and Corrugation - 10 days

Code 05

Pumping and Depression - 30 days

Code 06

No/Faded Road Markings - 15 days

Code 07

Low/Inverted Shoulders - 7 days

Code 08

Lush vegetation - 3 days

Code 09

Clogged Drains - 3 days

Code 10

Open Manhole - 10 days

Code 11

No/Inadequate Sealant in Joints - 3 days

Code 12

Cracks - 3 days

Code 13

Ravelling - 7 days

Code 14

Unmaintained Road Signages - 3 days

Code 15

Unmaintained Bridges - 3 days

a. Shall institute all measuresto ensure that DEOsare performing their assignedtasks and responsibilities under this Order,



b. Shall closely monitor the physical condition of all national roads within hisjurisdiction and shall support all DEOs to successfully achieve the DPWH objective for better and safer roads. The Assistant Regional Director and theRegional Maintenance Engineer are enjoined to faithfully assist in these tasks.

Regional Directors

a. Shall designate Maintenance Point Persons (MPPs), who are preferably apermanent staff occupying the position of Engineer II; Construction or Maintenance Foreman or Construction or Maintenance Capataz. For urbanareas, each MPP will be assigned approximately 20 kms and for semi-urbanto rural areas, approximately 40 kms. Assigning Maintenance Area Engineers shall henceforth be discontinued;


b. Shall closely monitor the activities of the District Maintenance Engineer toensure that the scheduled works (repair of defects and rectification activities)are prioritized and implemented.


Assistant District Engineers

a. Shall be directly responsible for the efficient and timely maintenance of all national roads and bridges within their respective jurisdictions;



b. Shall be held accountable for the proper expenditure of maintenance fundsand in the management of all other resources intended for the repair and maintenance of each road and bridge section in their area of concern;



c. Shall promptly submit to the Undersecretary for Technical Services, copy furnished the Director, Bureau of Maintenance, the names and latest picture of the MPPs and their respective assigned road section. Any changes in the assignment shall be submitted likewise to the above Offices.

District Engineers

a. Shall conduct inspection, at least twice a week, of the entire road section including the bridges subject of his/her assignment for the purpose of identifying and recording all noted defects and deficiencies;



b. Shall log results of inspection using Form MP-1 (Daily Road Inspection Report) which contains location of noted defects/deficiencies; estimated quantity, etc, and in which MP-1 shall be submitted daily to the Maintenance Engineer, copy furnished the District Engineer.

Maintenance Point Persons (MPPs)

a. Shall assign technical personnel within his Office to regularly conduct actualfield inspections to validate if the MPPshad correctly logged and reportedthe location of the noted defects/deficiencies;


b. Shall immediately schedule rectification/repair works on thedefects/deficiencies noted by the MPPs, mindful of the response timeallowed for each defect;


c. As the DME's assigned technical personnel will conduct actual fieldinspections to regularly monitor the rectification/repair works to ensurequality and economic practicality of completed works, the DMEshall amongothers, order such works to be redone if the same is not to standards.

District Maintenance Engineer (DME)

loss of a discreet area of the wearing course layer, due to poor bondingbetween the surface and lower layer.

Delamination

often occurs as a result of poor bonding or adhesion between layers

Slippage cracking

- edge of the bituminous surface is fretted, broken or Irregular.

Edge Break

- breakdown or disintegration of slab surface at edges, joints, corners or cracks. It is greater than or equal to 50mm wide, measured from the face of the joint or crack, with loss of material, or broken Into two or more pieces.

Spalling

a depressed or broken part of a slab resulting from pavement cracking and disintegration of concrete.

Chuck-hole or Punch out

Interconnected or interlaced cracks forming a series of small polygons resembling an alligator hide.

Alligator Cracks

Deterioration of the upper concrete slab surface of more than 10mm affecting the whole slab.

MAJOR SCALING

is the bulging of the road surface generally parallel to the direction of traffic and/or horizontal displacement of surfacing materials, mainly in the direction of traffic where braking or acceleration movement occur.

Shoving

refers to transverse undulations, closely and regularly spaced, withwavelengths of less than 2 meters

Corrugations

is a longitudinal deformation in a wheelpath. May occur in one or both wheelpaths of a lane

Rutting

localized area within the pavement with elevations lower than the surrounding area. May not be confined to wheelpaths and could extend across several wheel paths.

Depressions

seeping or ejection of water from beneath the pavement through cracks causing rocking, faulting and slab cracking.

Pumping

is the vertical movement at a joint or crack under traffic

Rocking

is the difference In elevation across a joint or crack creating a "step" deformation.

Faulting

refers to shattered slab under this code.

Slab cracking

, a dip in the pavement surface almost invariably across a crack or joint.

Depression

Absence of pavement markings or as visually assessed, less than 50% visibility;

NO/FADED ROAD MARKINGS

Code 06-E

Edge Line

06-C

Center line

06-Y

Yellow Line ( Indudes Yellow Box Lines In major Intersections with traffic light; Red Box Lines for Metro Manila area)

Code 06-P

Pedestrian Lane (In schools, hospitals, government offices and major intersections)

This defect refers to the loss of or excess shouldering materials resulting on shoulder levelbeing lower or higher than the pavement level,

LOW/INVERTED SHOULDERS

which is the difference in elevation between the edge of slab and shoulder; typically occurs when the outside shoulder settles.

Lane-to Shoulder Drop-off

- growth of grass on shoulders along secondary roads.

Vegetated Shoulder

Growth of grass, weeds and shrubs or any kind of vegetation from the side of the canal to the RROW limits reaching an average height of 0.60 meters. This will indude trimming/pruning of trees In compliance with DO 93 s. 2014

LUSH VEGETATION

Obstructed flow of surface run-offs in the drains due to accumulated materials such as construction spoils, soil, garbage, leaves, rocks, and etc

CLOGGED DRAINS

Breaks on pavement occuring in variety of patterns ranging from isolated single crack to an interconnected pattern extending over the entire pavement surface.

CRACKS

- unconnected crack running transversely across the pavement/slab.

Transverse Crack

- unconnected crack running longitudinally along the pavement; can occur singly or as a series of nearly parallel cracks.

Longitudinal Crack

- interconnected cracks forming a series of blocks approximately rectangular in shape, commonly distributed over the full pavement. Cell sizes are usually greater than 1m.

Block Crack

- a crack extending diagonally from longitudinal edge to transverse joint

Corner Crack

- unconnected crack diagonally across a pavement/slab

Diagonal Crack

- unconnected irregular winding crack usually singular

Meandering Crack

- cracks on asphalt mirrored from the unsealed concrete weakened plane joint

Reflection Cracks

Progressive disintegration of the pavement surface by loss of both binder and aggregates

RAVELLING

Broken, damaged, vandalized, leaning, and dirty traffic signages, comprising of Regulatory Signs, Warning Signs and Information Signs

UNMAlNTAlNED ROAD SIGNAGES

Refers to any of the following commonly noted defects:


Clogged bridge deck water drain


Acumulated sand, gravel, dirt and grass/weed on bridge deck


Damaged curbs, sidewalk, wingwall, railing


No/faded bridge paint and bridge name


Absence of warning sign (load limit)


Obstruction on bridge waterway


Scaling, spelling and cracking on bridge deck

UNMAlNTAlNED BRIDGES

Subject of Do. 41. s.2016

AMENDED POLICY GUIDELINES ON THE MAINTENANCE OF NATIONAL ROADS AND BRIDGES

The department order that Do. 41 s.2016 superseded

Department Order No. 171, s. 2015: "Policy Guidelines on the Maintenance of National Roads and Bridges"