• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/11

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

11 Cards in this Set

  • Front
  • Back

An authority to operate a public telecommunications service issued by the Commission based on the premise that the provision of said service and the authorization to do business will promote public interest in a proper and suitable manner.

Certificate Of Public Convenience And Necessity

A temporary authority to operate a public telecommunications service issued by The Commission.

Provisional Authority

A wide area mobile area mobile telephone system composed of cluster of cells capable of providing high-capacity mobile as well as fixed telecommunications by utilizing frequency re-use techniques.

Cellular Mobile Telephone System (CMTS)

Used to express the probability that a call will be lost due to switching and/or transmission congestion.

Grade of Service (GoS) Figure

What frequencies are allotted for CMTS user equipment?

824-849 MHz


869-890 MHz

What radio frequencies are allocated for base stations?

890-915 MHz


935-960 MHz

What are the requirements to operate a natiobwide or regional CMTS?

a) Congressional franchise


b) CPCN


c) Provisional Authority

A nationwide CMTS must cover how much of all provincial capitals within 7 years?

80%

A regional CMTS must cover 80% of all provincial capitals within a region in how much period?

5 years

The grant of a CPCN or PA shall be subject to __________, __________, and _________ capabilities as determined by the Commission.

legal, technical, and financial capabilities

hjcjxd

gdggd