Use LEFT and RIGHT arrow keys to navigate between flashcards;
Use UP and DOWN arrow keys to flip the card;
H to show hint;
A reads text to speech;
56 Cards in this Set
- Front
- Back
COSAL
|
Coordinated Shipboard Allowance List - all parts we are allowed to carry
|
|
Types of COSAL
|
HME - Hull Maintenance Equipment
MAM - Maintenance Assistance Module OSI - Operating Space Item |
|
Ways to update a COSAL
|
COSAL feedback report
ACR - Allowance Change Request 4790/CK - Config Change |
|
ACR
|
Allowance Change Request
|
|
OMMS-NG
|
Organizational Maintenance Management System - New Generation
|
|
What is OMMS-NG used for
|
To report jobs. 1) fix equipment 2) order parts
|
|
NSN
|
National Stock Number: second part is NIIN (9 digits)
|
|
How many digits are there in a NSN?
|
13
|
|
NIIN
|
Navy Item Identification Number
|
|
OPTAR
|
Operating Target - Ship's budget
|
|
How many types of OPTAR do we have and what are they?
|
2: EMRM and Other
|
|
EMRM
|
Equipment Maintenance Related Material
|
|
APL
|
Allowance Parts List - List of parts you are allowed to order for a job
|
|
DLR
|
Depot Level Repairable
|
|
2 prices associated with DLR's
|
Net Price and Standard Price
|
|
Name a couple of advice codes associated with DLR's
|
5G, 5S, 5D, 5A
|
|
What can you find on a COSAL
|
NIIN, Part Number, APL, Quantity, Nomenclature, Allowance, Parts, Tools, Serial Number, Cage, Manufacture
|
|
What is the purpose of the ship's store?
|
Morale, Profit for MWR, Convenience
|
|
What is the General Mess Summary Document?
|
NAVSUP 1359 - Monthly on the 5th of every month
|
|
What are the four signatures required on the NAVSUP 1359?
|
Leading CS, FSO, DISBO & XO
|
|
What is the percentage for the Daily food allowance for each meal?
|
Breakfast 20%, Lunch 40%, & Dinner 40%
|
|
JCN
|
Job Control Number: 1) UIC 2) Julian Date 3) Dept Serial Number
|
|
What makes up a requisition number?
|
R21451 - 1008 - D100
UIC - Julian Date - Supply Serial Number |
|
Is a requisition number an External or Internal transaction?
|
External
|
|
MOV
|
Material Obligation Validation - list of outstanding parts (parts we have not recieved), we state if we still need it or not
|
|
How many types of MOV's are there and what are they?
|
Internal - done monthly
External - done quarterly |
|
How often are internal & external MOV's done?
|
Monthly and quarterly
|
|
What kind of material can I purchase with EMRM?
|
DLR's & Repair Parts (ie: fuses, lightbulbs)
|
|
What kind of material can I purchase with other?
|
Consumables
|
|
What is a Fleet Freight Routing Message?
|
A message that is sent out prior to entering an area, letting them know where to send out Parts, Food & Mail. EX: if operating in 5th fleet all our material goes to Bahrain
|
|
ATAV
|
Afloat Total Asset Visibility - it is used to see what ships if any may carry a part we need (so we can borrow from another ship)
|
|
If ordering a DLR, what would the requisition number start with?
|
D
|
|
If ordering a CASREP, what would the requisition number start with?
|
W
|
|
What does MSDS stand for?
|
Material Safety Data Sheet
|
|
What can be found on a MSDS?
|
Material Safety Data Sheet
|
|
What can be found on a MSDS?
|
PPE, POC (point of contact), NSN (national stock #), hazmat concentration
|
|
CARGO
|
Consolidated Afloat Requistioning Guide Overseas - Consumable material from CLF ships (we do RAS w/ there ships)
|
|
MAM
|
Maintenance Assistance Module
|
|
What is the timeframe (max hours for turning in a DLR?
|
72 hours
|
|
RIP CHIT
|
Remain in place - part that needs to be exchanges will remain in place until the new part arrives
|
|
Who approves the RIP chit onboard the ship?
|
Commanding Officer
|
|
What is the purpose of the MOV
|
To validate outstanding requirements if still needed, completed or received.
|
|
What are the 3 categories of Urgency of Need?
|
A B and C
|
|
What is the urgency of need for a CASREP material
|
A
|
|
What form is used as a reciept document?
|
DD Form 1348 - reciept that we recieved a part: 1) circle quantity, NIN 2) sign name 3) date
|
|
What form is used as a survey document?
|
DD form 200
|
|
What is a DD Form 1149?
|
Invoice and Shipping document
|
|
When do you see the DD Form 1149 being used?
|
Shipment of material, fule invoice & procurement through FISC Contracting (when over $3000 open purchase chits)
|
|
What is the discharge limitation for paints?
|
Never dump over the side
|
|
What is the discharge limitation for Plastics?
|
Keep onboard for a minimum of 20 days, has to be negatively buoyant, discharge over 50NM
|
|
What is the discharge limitation for trash?
|
Beyong 25NM
|
|
What is the discharge limitation for oily waste?
|
minimum of 50NM
|
|
What is UMS
|
Urgent Material Screening - Screen other ships & force them to give us a spare part
|
|
Describe UMS process
|
System that allows various units in the battle group to share stock on hand assets
|
|
HAZMAT
|
F - Flamable
A - Arisol T - Toxic C - Corrosive O - Oxidizers C - Compressed gasses |
|
Process a job
|
1. Job in OHMS
2. Put part on order, look in APL 3. Chief approves job 4. divo approves 5. R supply a) tech edit - verify infomational data b) reqirement review - get part from inventory COSAL or requisition (order part) |