Use LEFT and RIGHT arrow keys to navigate between flashcards;
Use UP and DOWN arrow keys to flip the card;
H to show hint;
A reads text to speech;
26 Cards in this Set
- Front
- Back
Lockheed Kill Chain |
RWDEICA - Recon, Weaponization, Delivery, Exploitation, Installation, C2, Actions on Objective |
|
Incident Response |
PICERL - Preparation, Identification, Containment, Eradication, Response, Lessons Learned |
|
Diamond Model |
Anyone Can Ingest Viagra - Advesary, Capability, Infrastructure, Victim |
|
RPO |
Recovery Point Objective - How long you can be without data |
|
RTO |
Recovery Time Objective - Time after event to resume normal operations |
|
MTBF |
Mean time between failures - Time between failure of a device |
|
MTTR |
Mean time to repair - Time for repair of an asset |
|
Data Owner |
Senior executive labels and ensures controls |
|
Data Steward |
Quality of the data |
|
Data Steward |
Reponsible for system in which data is stored |
|
Privacy Officer |
Responsible for protected data PHI PII |
|
RAID 0 |
Two striped disks |
|
RAID 1 |
Two mirrored disks |
|
Raid 5 |
Striped disks with parity |
|
Raid 6 |
Striped with double parity |
|
Raid 5 |
Striped disks with parity |
|
Raid 6 |
Striped with double parity |
|
Raid 5 |
Striped disks with parity |
|
Raid 6 |
Striped with double parity |
|
Raid 10 |
Combination of Raid 0 and Raid 1. Two striped raids of mirrored raids |
|
CI Continuous Integration |
Rapid deployment to build server |
|
CD Continuous Delivery |
Application and platform requirements are tested and immediately available |
|
CD Continuous Delivery |
Application and platform requirements are tested and immediately available |
|
Continuous Deployment |
Commited to production rapidly through automated testing |
|
SLE |
Single Loss Expectancy - Asset Value times Exposure factor SLE = AV x EF |
|
ALE |
Annual Loss Expectancy - Yearly loss of asset value. ALE = SLE x ARO. ARO = Annual Rate of Occurrence |