Use LEFT and RIGHT arrow keys to navigate between flashcards;
Use UP and DOWN arrow keys to flip the card;
H to show hint;
A reads text to speech;
33 Cards in this Set
- Front
- Back
strategic |
Relates to the identification of long-term or overall aims and interests of achieving them |
|
Capacity |
Upper limit or ceiling on the load |
|
Capacity |
includes: equipment, space, employee skills |
|
Capacity planning |
Determines the capacity desired by an entity with a given forecast of demand |
|
Capacity planning |
1st step when a firm decides to produce new or more product |
|
Demand forecast |
Determination of future demands |
|
Demand forecast |
takes note of degree of uncertainty and accuracy |
|
Strategic planning capacity |
To achieve a match between long-term supply capabilities of an organization and the predicted level of long term demand |
|
Overcapacity |
Too high operating cost |
|
Inadequate capacity |
Strained resources |
|
Inadequate capacity |
Possible loss of customers |
|
Capacity investment |
Needs a planning backed with a formulated strategy and wise capacity decisions |
|
Measuring capacity |
Measures efficiency and utilization of operations |
|
Efficiency |
Signifies a level of performance that describes using the least amount of input to achieve the highest amount of output |
|
Utilization |
How well a resource is being used |
|
Design capacity |
Maximum output rate |
|
Effective capacity |
Design capacity minus allowances |
|
Actual output |
Rate of output actually achieved |
|
Long-term capacity |
Forecasting demand over a time horizon |
|
Short term capacity |
Less concerned with cycles or trends than with seasonal variations |
|
Demand management strategies |
can be used to offset capacity limitations |
|
Economies of scale |
Output rate is less than the optional level |
|
Diseconomies of scale |
Output rate is more than the optimal level |
|
Bottleneck operations |
An operation in a sequence of operations whose capacity is lower than that of the other operations |
|
Constraints |
Something that limits the performance of a process or system in achieving its goals |
|
Cost-volume analysis |
Focuses on relationship between cost, revenue, and volume of output |
|
Cost-volume analysis |
Estimate the income of an organization |
|
Financial analysis |
Rank the investment proposals |
|
Cash flow |
Refers to the cash received and cash outflow |
|
Present value |
Expresses in current value the sum of all future cash flows |
|
Decision theory |
Involves identifying a set of possible future conditions |
|
Waiting line analysis |
Helps managers choose capacity levels |
|
Simulation |
Useful tool in evaluating what if scenarios |