• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/12

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

12 Cards in this Set

  • Front
  • Back
If a person is not sure a piece of equipment is safe to work on, he or her should
ask a qualified worker to indicate and explain the points of isolation
Safety meetings should routinely be held:
monthly
Ensuring the complete isolation of a piece of equipment prior to maintenance is the responsibility of:
both the Operating and Maintenance Departments
Work permits issued to work on isolated equipment require the signature of:
the isolator and the worker involved
After completing the isolation of equipment:
you must enter the completed isolations in the log book
In addition to opening the breaker when isolating electrical equipment the isolator should:
have the fuses removed by a qualified personnel
The best possible method of ensuring a boiler is fully isolated is to:
install blind flanges wherever required
When isolating a steam turbine driven centrifugal pump you should first:
close the high pressure steam supply valve
When Isolating a Steam Boiler you should first:
Isolate, Dran & lockout
When isolating a sodium zeolite softener you should first:
Close effluent valve
Last step in isolating a pump & driver is:
Open pump casing drain
Last step in isolating a boiler is: