• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/4

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

4 Cards in this Set

  • Front
  • Back

What is the underground rough-in phase?

A plumber locates all the supply and waste connections from the building system to public utilities, and establishes where these systems will enter or leave the building.

What can be regarded as the fourth phase of plumbing projects?

Service and maintenance

What tasks does service and maintenance include?

1. Checking lubrication levels and pumps, test guages and meters


2. Repairing faulty fixtures and components


3. Verifying the operating system


4. Regulating the flow and usage rate



What are the three phases of plumbing?

1. Underground rough-in phase


2. Above ground rough inphase


3. Finishing phase (Trim-out)