Use LEFT and RIGHT arrow keys to navigate between flashcards;
Use UP and DOWN arrow keys to flip the card;
H to show hint;
A reads text to speech;
29 Cards in this Set
- Front
- Back
55.(421) Which of the following is not performed during the system-engineering phase of predeployment?
|
Ensuring equipment readiness
|
|
56.(421) When performing equipment checks in the predeployment stage, what frequencies and configurations should you use?
|
The frequencies and configuratins spelled out in the frag order.
|
|
57.(421) All of the flollowing is covered in the predeployment briefing except the
|
exact duration of the deployment
|
|
58.(422) The employment phase of a mobility exercise begins when the
|
first element of the convoy departs
|
|
59.(422) The employment phase of a mobility exercise ends when
|
the end-ex order is received from the governing authority
|
|
60.(423) The first step in recovery at the employment site is to
|
conduct a safety briefing
|
|
61.(424) Into how many Aeorspace Expeditionary Forces is the Air Force Total Force divided?
|
10
|
|
62.(424) Aerospace Expeditionary Forces are sized to
|
meet steady-state rotational requirements for forward deployed forces
|
|
63.(424) If assigned to an Air Force Expeditionary Force, how often can you expect to be deployment vulnerable?
|
90 days every 15 months
|
|
64.(425) What is developed for systematic planning of force packages?
|
unit type codes
|
|
65.(425) What is the unit type code identifier for communications and information?
|
6k
|
|
66.(426) Name the nerve center for all deployment activity throughout the Air Force.
|
AEFC
|
|
67.(427) The mission of TRI-TAC is to
|
design,develop,and acquire swithced tactical digital communications to increase communications interoperability within the US armed services and NATO
|
|
68.(427) Where does the term TRI-TAC come from?
|
Tri-service tactical
|
|
69.(428) Tropospheric transmission systems are normally effective up to
|
150 miles
|
|
70.(429) Which two units make up the unit level circuit switch (ULCS)?
|
AN/TTC-42 and SB-3865
|
|
71.(429) What is the maximum number of swiched circuit lines the AN/TTC-42 can support?
|
150
|
|
72.(430) What supplies electrical power for TRI-TAC equipment in deployed scenarios?
|
A/E 24U-8
|
|
73.(430) What TRI-TAC equipment supplies environmental control for the deployed communications equipment?
|
AE 32C-24
|
|
74.(431) Which,if any, environmental factors must be considered when installing theater deployable communications (TDC) components?
|
TDC components can be installed in semi-environmentally controlled customer areas.
|
|
75.(431) Who supplies the crypto keys and video-teleconferencing terminal equipment when deploying theater deployable communications equipment?
|
The customer
|
|
76.(432) How many satellite links can the lightweight multiband satellite terminal support?
|
1
|
|
77.(432) Which of the following nomenclature identifies a trailerized version of the lightweight multiband satellite terminal?
|
AN/TSC-152
|
|
78.(432) What type of generator system is required to power the lightweight multiband satellite terminal?
|
2-10kw
|
|
79.(433) How many 2-wires analog telephones will the basic access module support?
|
60-80
|
|
80.(433) What is the difference between the configurable access module(CAM) and the basic access module (BAM)?
|
The CAM contains an Ethernet router capable or routing data traffic outside the domain
|
|
81.(434) What is the power requirement to power a CAN?
|
20 amp, 110volt
|
|
82.(435) During the sustainment phase, what should be provided to ensure survivability of the deployed network?
|
Multiple transmission paths
|
|
83.(436) How many deployed personnel can be supported by an intial deployment package?
|
30-100
|