Use LEFT and RIGHT arrow keys to navigate between flashcards;
Use UP and DOWN arrow keys to flip the card;
H to show hint;
A reads text to speech;
51 Cards in this Set
- Front
- Back
What does OMMS-NG |
Organizational Maintenance Managing System - Next Gen |
|
What steps are taken to find a JSN for your work center and OMMS-NG? |
New list, work candidate, highlight work center, and create list |
|
What does CSMP stand for? |
Current ships maintenance Project |
|
What report do you run in OMMS-MG to obtain your CSM P by JSN? |
MJB516 |
|
What kind of information is provided on the CSMP? |
-list of all JSN's -problem description -recommended solutions -what type of equipment -maintenance level |
|
CAS REP Priority codes? |
Cat 1 With PRI-4 desirable Cat 2 with PRI-3 highly desirable Cat 3 with PRI -2 essential Cat 4 with PRI- 1 mandatory |
|
What is category B FBR? |
Technical |
|
When would the WCS submit urgent feedback report? |
-used to submit/report technical deficiencies in PMS documents -could result in detrimental effect on personal safety, safety of ship or damage to equipment |
|
Periodicity codes? -Q -S -A -R -U -SU -LU -M -OT -AP -PM |
-quarterly -semi annually -annually -as required -unscheduled -start up -lay up -monthly -operational test -assessment procedure -periodic maintenance |
|
What type of checks can be lost? |
-check that has a periodicity of less than weekly -situational checks or not applicable |
|
When should a scheduling And execution Effectiveness review (SEER) be performed? |
All of the above |
|
What is the meaning of a caution note on the MRC? |
-damage to equipment may result if the operating procedures and practices, etc , are not correctly followed |
|
What is the meaning of a warning note on the MRC? |
-could cause death or injury of personnel |
|
What is the OPNAV 4790/CK? |
-alternation form |
|
What is a reenactment spot check? |
-A spot check where the main person briefly describes/walkthrough, what maintenance person did for the check |
|
What is a RE-performance spot check? |
-a spot check where the maintenance person redos his or her check -includes tag out amd HAZMAT procedure |
|
List 2 references of performing a tag out? |
-TUMS -NSTM |
|
How would you instruct your maintenance person to dispose of HAZMAT? |
-double bag (clear) properly labeled and segregated |
|
What is the purpose of performing a tag out? |
-to prevent death or injury to personnel |
|
What manual is the NAVSEA INST 4790. 8C? |
3M manual |
|
Who is overall responsible for the ship's 3M program? |
-Commanding officer |
|
When is periodic maintenance (PM) accomplished? How is it scheduled? |
Periodic maintenance actions accomplished on a reoccurring basis during inactive period to prevent equipment deterioration |
|
What is the procedure in ordering non-maintenance related parts and maintenance related items? |
R-supply |
|
Where do you go to get assistance for a part not listed request ? |
-MSC |
|
What is the purpose of an APL/AEL? |
-list of parts/tools associated with an equipment |
|
Where would you go to update a configuration item in OMMS-NG that is incorrect or Out of date? |
-MSC |
|
What does IUC stand for? |
Intermediate unit commander |
|
What are the screening maintenance level codes and what do they stand for? |
1-OWC 2-ORG level 3 IMA 4-depot |
|
What are the minimum qualifications requirements for damage control maintenance? |
-3M 301 maintenance person -DC 301-306 basic DC - QA 301 Craftsman and DCPO |
|
What are a workcenter supervisor's responsibilities for SKED 3.2? |
All of the above |
|
What is a split MIP? |
MIP that includes MRCs that are completed by different workcenters |
|
Are partial points authorized to be awarded anywhere on the spot check form? |
-no |
|
What checklist do you use prior to pulling fuses? |
-requirements for fuse removal and replacement -recommendations for fuse pulling and replacement -both A and D |
|
Who approves split MIPS? |
- Executive officer |
|
Who is required to initial MIP Line outs ? |
-LCPO |
|
How do you assign maintenance on SKED 3.2? |
-Highlight check, click assign, select name |
|
What does a symbol code "e /" on the maintenance weekly board mean? |
-system check was completed by someone else |
|
What does the symbol code " # " On the maintenance index page identify ? |
Mandatory related Maintenance |
|
In MIP SYSCOM control number what does the letters A, B, C, Stand for in the 1st digit place ? |
October,November, December |
|
What does PAR stand for an SKED 3.2? |
Periodic accomplishment rating |
|
What does SAR stand for an SKED 3.2? |
Situational accomplishment reading |
|
What does AAR stand for an SKED 3.2? |
Administrative accomplishment rating |
|
What does SCAR stand for an SKED 3.2? |
Spot check accomplishment rating |
|
An SKED 3.2, when would you submit a checknote? |
Amplifying information such as WAF, Tag outs |
|
Difference between a check note and an alert note? |
-check note: provides reason why maintenance cannot be accomplished -alert note : a maintenance that was completed or checked off but discrepancy must be reported via OMMS-NG |
|
What is IEM stand for? |
Inactive equipment maintenance |
|
What is IEM status I? |
Equipment that will remain on board, is not scheduled for corrective maintenance and will be inactive for 7 days or concur |
|
What is IEM status II? |
Equipment that is inactive and directly subject to corrective maintenance overhaul or removal for safe storage or as temporarily transferred to another activity for 7 days or longer |
|
In SKED 3.2, what is a local event? |
Event that affects individual workcenter and requires scheduling of multiple MRC's/MIP's |
|
In SKED 3.2, what is a custom event? |
Is used to create and view a list of special triggers that are used for your ship only. This display uses custom events in a table display. Is also used to a sign MRC that will be scheduled by a particular custom trigger |
|
What is a category A FBR? |
Non-technical |