Use LEFT and RIGHT arrow keys to navigate between flashcards;
Use UP and DOWN arrow keys to flip the card;
H to show hint;
A reads text to speech;
104 Cards in this Set
- Front
- Back
Define the term “management.”
|
The efficient attainment of objectives.
|
|
What is the definition of maintenance?
|
Actions taken to retain material in a serviceable condition or to restore it to serviceability.
|
|
Define the term “maintenance management.”
|
Actions taken to retain or restore material or equipment to a serviceable condition with a minimum expenditure of resources.
|
|
What work center manages and coordinates the overall production effort to maintain squadron aircraft in a mission-capable condition?
|
Maintenance control.
|
|
What division controls the daily workload and assign work priorities to the various work center supervisors?
|
Maintenance/Production Control.
|
|
Who is responsible to prepare and publish the monthly
maintenance plan (MMP) for the AMO’s signature? |
The maintenance material control officer (MMCO).
|
|
What division is responsible for ensuring that aircraft undergo functional maintenance check frights as required?
|
Maintenance control.
|
|
What division maintains the Aircraft Discrepancy Book?
|
Maintenance control.
|
|
What is the primary purpose of the daily maintenance meeting?
|
It allows supervisors to brief the maintenance chief on the status of equipment, components, or aircraft that are in work or are scheduled to have maintenance performed.
|
|
What instruction provides specific guidelines on procedures for reporting your squadron’s readiness and material condition to supporting commanders?
|
Aircraft Material Readiness Reporting (AMRR), COMNAVAIRLANT/
COMNAVAIRPAC INSTRUCTION 5442.5D. |
|
When a special inspection is completed, how long must copy 3 of the controlling document be retained in the ADB?
|
At least 10 flights or until the completion of the next like inspection.
|
|
Who is responsible for releasing an aircraft as “safe for flight?”
|
The aircraft maintenance officer (AMO) or his designated representative.
|
|
What is the title of OPNAV 4790/141?
|
Aircraft Inspection and Acceptance Record.
|
|
When an aircraft is released as safe for flight, if not specified otherwise, when must fuel samples be taken?
|
Prior to the first flight of the day.
|
|
What publication contains detailed information on aircraft historical files?
|
OPNAVINST 4790.2
|
|
How long must aircraft inspection documents be maintained on file?
|
One inspection cycle or 6 months, whichever is greater.
|
|
A completed VIDS/MAF requesting "local manufacture of drip pans" would be maintained in what historical file?
|
Miscellaneous file.
|
|
Equipment Operational Capability (EOC) codes are used on VIDS/MAFs or in NALCOMIS to generate what reports?
|
SCIR reports.
|
|
The Mission Essential Subsystem Matrices (MESM) is used to select what position of the EOC code that is entered on the MAF?
|
The first position of the EOC code.
|
|
How are the second and third positions of the Equipment
Operational Capability (EOC) code determined? |
They are computer generated as determined by the documented Work Unit Code (WUC).
|
|
What information MUST be transcribed on both sides of each logbook page to ensure positive identification when pages are removed?
|
Aircraft model and bureau number.
|
|
Who is responsible for maintaining aircraft logbooks?
|
Reporting or physical custodians of all naval aircraft.
|
|
Where can information be obtained on a specific aircraft's structural life limitations?
|
The periodic maintenance information cards (PMICs) for that specific aircraft.
|
|
On what OPNAV record in the logbook would an overweight landing inspection be recorded?
|
Inspection Record OPNAV 4790/22A.
|
|
On what OPNAV record in the logbook would an aircraft service period adjustment (ASPA) inspection be recorded?
|
Repair/Rework Record, OPNAV 4790/23A.
|
|
Where and how are interim technical directives (TDs) recorded?
|
Interim TDs are recorded on the same sheet as formal TDs and identified by an "I" preceding the TD number.
|
|
What is the purpose of the Miscellaneous/History Record?
|
It provides a means of recording significant information that affects the aircraft or equipment for which no other space is provided in the logbook.
|
|
When aviation life support system's components, kits, or assemblies are involved in an aircraft mishap, what must be done with the associated records?
|
The appropriate records are to be forwarded as required by OPNAVINST 3750.6 and NAVAIR 13-1-13 manuals for investigation.
|
|
When is an entry not required on OPNAV 4790/136A for preservation of installed equipment?
|
If the equipment is not preserved as part of an aircraft preservation action.
|
|
Once an engine module is installed in a particular propulsion system, what becomes of the Module Service Record (MSR)?
|
It is maintained concurrently with and becomes part of the Aeronautical
Equipment Service Record (AESR). |
|
In what section of the Assembly Service Record is the removal data documented?
|
Section IV.
|
|
What record is used to document the maintenance history data of an aeronautical component that has been determined to be life limited?
|
The Scheduled Removal Component (SRC) Card OPNAV 4790/28A.
|
|
What system was devised to provide standardized Department of the Navy flight activity data collection information?
|
Naval Flight Record Subsystem (NAVFLIRS).
|
|
In the intermediate maintenance activity (IMA), what work center is responsible for maintaining positive control of all accountable material?
|
Production control.
|
|
What action is taken at least weekly to ensure all parts on order are still required and all required parts are still on order?
|
Awaiting parts (AWP) validation.
|
|
Production control works with what other work centers in the supply department to set workload priorities?
|
Component control section (CCS) and the aeronautical material screening unit (AMSU).
|
|
“Actions taken to retain material in a serviceable condition or to restore it to serviceability” defines which of the following terms?
|
Maintenance
|
|
Define the term "management."
|
The efficient attainment of objectives
|
|
What are three primary responsibilities of maintenance control?
|
Coordinate and monitor the workload of the maintenance department
Establish procedures to monitor the Subsystem Capability and Impact Report (SCIR) Validate NMCS/PMCS supply status listings daily |
|
What work center, division, or department is responsible for establishing procedures for controlling cannibalization within a squadron?
|
Maintenance control
|
|
If you need to perform maintenance on an aircraft that requires “no electrical power,” what must you do?
|
Request maintenance control place the aircraft in a “no power” status
|
|
What is the best tool for ensuring a smooth flow of maintenance information?
|
Daily maintenance meetings
|
|
What report enables supporting commanders to assess current material conditions and mission capabilities of squadron aircraft?
|
Aviation Material Readiness Report (AMRR).
|
|
By what means is the Aviation Material Readiness Report normally submitted?
|
Unclassified immediate message
|
|
Where can maintenance and aircrew personnel find an accurate, comprehensive record of all outstanding maintenance requirements on a specific aircraft?
|
The Aircraft Discrepancy Book
|
|
As a minimum, how long must completed MAFS be retained in the Aircraft Discrepancy Book?
|
10 flights
|
|
What form is used to designate an aircraft “safe for flight”?
|
OPNAV 4790/141
|
|
The Aircraft Inspection and Acceptance Record is signed by what person or persons?
|
The aircraft maintenance officer (or designated representative), the pilot, and plane captain
|
|
Activities using NALCOMIS must store current MAFs on the host computer. How many preceding months of completed MAFS must be stored?
|
2 months
|
|
For squadrons operating with VIDS/MAFs, which historical file should include engine–related VIDS/MAFs?
|
Aircraft inspection file
|
|
In the TD compliance historical file, at a minimum, how long must VIDS/MAFs be retained.
|
6 months from completed date
|
|
What reporting method was designed to reveal an equipments mission capability.
|
SCIR
|
|
SCIR reports are generated from what codes on the VIDS/MAFs or in NALCOMIS?
|
Equipment Operational Capability codes
|
|
The first position of the EOC code is derived from what source?
|
MESM, OPNAVINST 5442.4
|
|
When an aircraft is delivered to the Navy, the Aircraft Logbook, OPNAV 4790/19, is initiated by what activity or office?
|
Original accepting activity
|
|
Aircraft logbooks are normally kept in what location?
|
In the maintenance control office
|
|
What activity generates the Structural Life Limits Form, OPNAV 4790/142, for the aircraft logbook?
|
The squadron
|
|
The Inspection Record is identified by what OPNAV number?
|
OPNAV 4790/22A
|
|
The Repair/Rework Record is identified by what OPNAV number?
|
OPNAV 4790/23A
|
|
What type of technical directives are issued in greater numbers and require careful screening to ensure accuracy?
|
Powerplant Bulletins (PPB) and Powerplant Changes (PPC)
|
|
On the Aeronautical Equipment Service Record, oil analysis results are documented on what form or record?
|
OPNAV 4790/25A (Miscellaneous/History)
|
|
Which of the following actions requires an entry in the Miscellaneous/History section of an aircraft logbook?
|
The aircraft is damaged in an in-flight mishap
The aircraft is exposed to a large quantity of salt water Dye is added directly to the aircraft fuel tanks to determine the location of a leak |
|
Which of the following equipment does NOT require an Aeronautical Equipment Service Record (AESR)?
1. Aircraft engine 2. Aircraft propeller 3. Aircraft engine turbine assembly 4. Auxiliary power unit |
Aircraft engine turbine assembly
|
|
Explosive devices installed in personnel parachutes are recorded on what form or record?
|
Parachute Record
|
|
What record is used to record maintenance data for modules replaced by an intermediate maintenance activity?
|
Module service record (MSR)
|
|
What items should NOT to be listed on the Inventory Record, OPNAV 4790/27A?
|
Components requiring an Aeronautical Equipment Service Record (AESR)
|
|
What record is used to record TD compliance on a quick engine change kit (QECK)?
|
Equipment History Record (EHR)
|
|
Where is the hardback copy of the Parachute Record kept?
|
In the logbook of the aircraft in which the parachute is installed
|
|
What officer designates the maintenance of all original aviation life support systems (ALSS) records?
|
Aviation Maintenance Officer (AMO)
|
|
What is done with an EHR when the component is removed and turned into supply as a retrograde?
|
The EHR accompanies the component
|
|
Once the NAVFLIRS is signed certified for completeness by the aircraft commander, where does it go next?
|
Maintenance control for screening and entry of pertinent aircraft information into logbooks
|
|
What three persons or offices have the responsibility for ensuring validity of the Naval Flight Record Subsystem (NAVFLIRS)?
|
Analyst
Maintenance control Operations department |
|
What work center is considered the “nerve center” of the Intermediate Maintenance Activity?
|
Production control
|
|
Production control is directly responsible to what officer for the overall production effort?
|
The maintenance material control officer (MMCO).
|
|
What are the three primary responsibilities of Production Control personnel?
|
Maintain liaison with the supply department
Maintain VIDS display boards Ensure maximum use of material resources |
|
When you order parts for a component inducted into an I-level work center, what work center assigns the Project/Priority code to your request?
|
Production control
|
|
Priorities 2, 5, and 12 requisitions can be submitted by activities with what force activity designator (FAD)?
|
FAD II
|
|
True or False. Project codes are mandatory entries on all requisitions.
|
True
|
|
At a minimum, how often should a joint awaiting parts validation be performed with the AWP unit in supply?
|
Weekly
|
|
What priority is assigned to the repair of salvaged material?
|
Priority 4
|
|
What priority is assigned to the repair of material for non-mission capable aircraft?
|
Priority 1
|
|
What priority is assigned to the repair of critical local repair cycle assets (LRCAs)?
|
Priority 2
|
|
What priority is assigned to the repair of assets belonging to an activity within 30 days of deployment?
|
Priority 1
|
|
What priority is assigned to the repair of non-critical local repair cycle assets?
|
Priority 3
|
|
What priority is assigned to the repair or manufacture of material that is nonaeronautical?
|
Priority 4
|
|
What priority is assigned to the repair or manufacture of material for non-fixed allowance stock?
|
Priority 3
|
|
Which officers have the authority to adjust priorities to meet local support requirements?
|
IMA maintenance and supply officers
|
|
What is the form number for the Structural Life Limits page in the Aircraft Logbook?
|
OPNAV 4790/142
|
|
What is the form number for the Monthly Flight Summary page in the Aircraft Logbook?
|
OPNAV 4790/21A
|
|
What is the form number for the Inspection Record page in the Aircraft Logbook?
|
OPNAV 4790/22A
|
|
What is the form number for the Repair/Rework Record page in the Aircraft Logbook?
|
OPNAV 4790/23A
|
|
What is the form number for the Technical Directives page in the Aircraft Logbook?
|
OPNAV 4790/24A
|
|
What is the form number for the Miscellaneous/History page in the Aircraft Logbook?
|
OPNAV 4790/25A
|
|
What is the form number for the Preservation/Depreservation Record page in the Aircraft Logbook?
|
OPNAV 4790/136A
|
|
What is the form number for the Installed Explosive Device Record page in the Aircraft Logbook?
|
OPNAV 4790/26A
|
|
What is the form number for the Inventory Record page in the Aircraft Logbook?
|
OPNAV 4790/27A
|
|
What is the form number for the Parachute Record page in the Aircraft Logbook?
|
OPNAV 4790/101
|
|
What is the form number for the Seat Survival Kit Record page in the Aircraft Logbook?
|
OPNAV 4790/137
|
|
What is the form number for the Aircrew Systems Record page in the Aircraft Logbook?
|
OPNAV 4790/138
|
|
What is the form number for the Aeronautical Equipment Service Record (AESR)?
|
OPNAV 4790/29
|
|
What is the form number for the Module Service Record (MSR)?
|
OPNAV 4790/135
|
|
What is the form number for the Assembly Service Record (ASR)?
|
OPNAV 4790/106A
|
|
What is the form number for the Equipment History Record (EHR) Card?
|
OPNAV 4790/113
|
|
What is the form number for the Scheduled Removal Component (SRC) Card?
|
OPNAV 4790/28A
|