62 Cards in this Set
- Front
- Back
Who assumes responsibility for the entire project |
Prime contractor |
|
Safety belt lanyards shall not allow a fall greater than |
6' |
|
Safety nets extend ___' beyond the edge of work surface and no more than ___' below the working surface |
-8' -25' |
|
Heater must not be located within ___' of tapaulins or any combustible material |
10' |
|
Brick stacks shall not be higher than |
7' |
|
Block stacks shall not be higher than |
6' |
|
Lumber stacks shall not be stacked higher than ___' if stacked manually, or ___' if stacked mechanically |
- 16' - 20' |
|
What shall be removed before stacking lumber |
nails |
|
A closed chute is required if waste is dropped more than ___' |
20' |
|
What is required for a power saw |
Constant pressure switch |
|
___ is required before use of powder actuated tools |
Training |
|
All portable power driven circular saws must be equipped with guards ___ & ___ the base or show |
Above & Below |
|
Gas cylinders shall be secured in an ___ position at all times |
upright |
|
Oxygen and fuel cylinders must be separated by a minimum of ____' during storage |
20' |
|
When cylinders are stored inside they must be at least __' from combustible materials |
20' |
|
All gas or oxygen hoses must be inspected when |
at the beginning of each work shift |
|
Workers must be provided a ____ when working in confined spaces |
Lifeline |
|
Scaffolding must be able to support |
Their own weight + 4x the intended load |
|
Maximum space between scaffolding planks |
1" |
|
Platforms and walkways must be at least |
18" wide |
|
A platform must not be more than ____" from the face of work |
14" |
|
Platforms must be lapped at least ___" |
12" |
|
What is used to support scaffolds |
Mud Sills |
|
Maximum vertical intervals for scaffolding |
35' |
|
Guardrail height must be between |
38-45" |
|
Clearance between scaffolds and power lines less than 300 volts |
3'
|
|
Clearance between scaffolds and power lines more than 300 volts |
10' |
|
Scaffold Casters must |
Lock |
|
An unprotected side or edge which is 6' or more above a lower level |
must be protected |
|
Any worker reaching more than 10" below his working platform |
Shall have fall protection |
|
Guardrail height shall be |
42" +/- 3" |
|
Vertical members of guardrails shall not be more than |
19" apart |
|
If wire rope is used as a guardrail it should be flagged at not not than |
6' intervals |
|
Safety nets must be tested with a ____ lb sand back with a diameter of ____" |
- 400lb - 30" +/- 2" |
|
Horizontal lifelines should have a safety factor of |
2 |
|
Lanyard and vertical lifelines shall have a minimum break strength of |
5000 lbs |
|
The attachment point of a body harness is |
the center of the wearer's back |
|
A warning line must be located ___' from the edge of the roof |
6' |
|
Materials must not be stored within ___ ' of the roof edge |
6' |
|
Rollover guards shall not be less that ___" steel plate or __" woven wire mesh |
- 1/8" - 1/4" |
|
The failure of a crossbrace is called a |
kickout |
|
With excavation that exceeds 4' depth, a means of egress should be placed that allows no more than ___' of travel |
25' |
|
In excavation where hazardous atmosphere, the air must |
be tested prior to workers entering the area |
|
Materials shall not be placed within ___' of the edge of excavation |
2' |
|
There must be no more than ___ floors or ___' or unfinished bolting or welding above the uppermost permanent floor |
- 4 floors - 48' |
|
The max weight of steel joist bridging that can be hoisted is ____ lbs |
1000 |
|
When portable ladders are used for an upper landing surface the ladder side rails shall extend |
3' above the upper landing surface |
|
The top or top step of a step ladder shall not be used as |
a step |
|
When ascending or descending a ladder the user shall |
face the ladder |
|
OSHA citations must be posted at the jobsite within ____ days of issue |
3 |
|
To prevent energizing of equipment or tools use |
lockout tags |
|
Emergency Action plans must be written where an employer has |
11 or more employees |
|
First aid kits shall be inspected ____ at jobsites |
Weekly |
|
Exposure to impulsive or impact noise should not exceed |
140dB peak sound pressure level |
|
A guard rail system shall be capable of withstanding without failure a force of at least ____ lbs applied within 2" of the top edge |
200 |
|
Compressed air can only be used for cleaning when reduced to ___ psi |
30 |
|
Loose brick stacks of ___' are prohibited |
4' |
|
1 Toilet Seat/Urinal per every ___ workers |
50 |
|
A mechanism that prevents firing of more than ____ psi must be used on pneumatic tools |
100 |
|
The atmosphere in excavations greater than ____' in depth must be tested before workers enter |
4' |
|
For pneumatic-tired earth moving equipment whose max speed exceeds ___ mph, it must be equipped with fenders |
15 mph |
|
Oxygen cylinders, hoses, fittings, and regulators must be kept away from |
oil and greese |