Use LEFT and RIGHT arrow keys to navigate between flashcards;
Use UP and DOWN arrow keys to flip the card;
H to show hint;
A reads text to speech;
36 Cards in this Set
- Front
- Back
What does BEEP stand for?
|
Battalion Equipment Evaluation Program
|
|
What is the purpose of the BEEP?
|
Pass on all 1) special knowledge, 2) techniques, and 3) condition evaluation.
|
|
What document assists management at all levels of the transportation program?
|
P-300
|
|
Which document deals with WHE?
|
P-307
|
|
What licesne covers all vehicels from 1 1/4 ton pickup to 20 ton tractor?
|
OF/346
|
|
What items are considered CESE?
|
Automotive Equipment, Mechanical Equipment, Weight-Handling, Railroad, CEEI: Civil Engineer End Items, Industrial equipment that is typically non-portable Shop equipment costing more than $1000.
|
|
What is a trip ticket?
|
Computer generated or DD 1970. Is the official authorization to operate a vehicle and contains a record of destination, time of departure, and odometer readings.
|
|
What is an SF-91?
|
A mishap reporting form that must be filled out ON SITE before leaving an accident.
|
|
What is the Heavy Construction Equiment License and how long is it good for?
|
11260/2
Good for 2 years on birthday. |
|
What form is given to the other party in case of vehicle accident?
|
DD-518
|
|
What is "Deadline" for CESE?
|
Equipment that will not be available for 3 working days?
|
|
What is NORS?
|
Not Operationally Ready
|
|
What is ANORS
|
Anticipated to be not Opperationally Ready due to Supply
|
|
How long can equipment go into Live Storage?
|
80 days
|
|
What is the "Red Book"
|
COMSECONDNCB/COMTHIRDNCBINST 11200 which provides guidance on Equipment management.
|
|
What is the role of the Crane Certifying Official?
|
Overall program safety
|
|
What is the role of the Crane Crew Supervisor?
|
Assignes members of crane team and completes lift safety checklist
|
|
What is the role of the Rigger in Charge?
|
Completes the lift plan
|
|
What condition code is "unused equipment"?
|
A1-3
|
|
What condition code is "servicable/used-good"?
|
A4
|
|
What condition code is "serviceable/used-fair"?
|
A5
|
|
What condition code is "serviceable/used-poor"?
|
A6
|
|
What is the goal for CM to equipment ratio?
|
1:5
|
|
What is the availability goal for CESE?
|
>90%
|
|
What is the goal for deadline CESE?
|
<5%
|
|
What is the goal for PM to Interim ratio?
|
6:1
|
|
What does HMMWV stand for?
|
High Mobility Multi Wheeled Vehicle
|
|
What does MTVR stand for?
|
Medium Tactical Vehicle Replacement
|
|
What constitutes CESE?
|
1) Automotive Equipment; 2) mechanical construction equipment; 3) WHE; 4) MHE; 5) railroad equipment; 6) Civil Engineer End Items (CEEI); and Industrial equipment non-portable shops that costs more than $1000.
|
|
What does CESE stand for?
|
Civil Engineering Support Equipment
|
|
What does the Equipment Yard Supervisor do?
|
The "Yard Boss" supervisors minimum crew of 4 and makes sure pre-start checks are done and that Operator's Inspection Guide and Trouble Reports are completed.
|
|
What does the Cost Control Supervisor do?
|
Supervised the PM clerk, DTO Clerk, Technical Librarian, and the Tool Room Custodian.
|
|
What does the Preventitive Maintenance Clerk do?
|
Controls the PM program as directed by the Maintenance Supervisor.
|
|
What does the Direct Turnover Clerk do?
|
The "DTO" maintains repair parts.
|
|
What does the Collateral Equipment Custodian do?
|
Inspects all collateral equipment for comleteness, deterioration, preservation, shelf life, and proper stowage. Completes Equipment Repair Order (ERO).
|
|
What rank is the dispatcher?
|
Typically an EO1.
|