Use LEFT and RIGHT arrow keys to navigate between flashcards;
Use UP and DOWN arrow keys to flip the card;
H to show hint;
A reads text to speech;
61 Cards in this Set
- Front
- Back
What does the acronym ACN stand for? |
Advance change notice |
|
What does unscheduled maintenance MRC document? |
Actions required to restore a system/equipment to a predetermined operational condition |
|
Which of the following periodicities is a non-calendar periodicity? |
R-1, R-1D, R-1W, R-1M, R-2M |
|
A quarterly schedule covers what time period |
Three months |
|
Which of the following information is NOT contained in the 13-week accountability log? |
Job sequence number (JSN) tag out serial number (contained) Printed name (contained) Date (contained) |
|
What action is required to fix equipment that has failed or is not working to desired performance standards? |
Corrective maintenance |
|
What is one of the purpose of the tag -out user's manual? |
Prevents improper operation when component, equipment, system or portion of a system is isolated or in an abnormal condition |
|
Who fills out the record sheet and prepares the tags? |
Ship's force pretty officer in charge of the operation/work item |
|
When does the maintenance person performing PMS sign for accomplishment? |
After completion of the maintenance |
|
Who has overall responsibility for ensuring maintenance is accomplished following the 3M system? |
Commanding officer |
|
What is the periodicity for MRC D-1R |
Daily and situational requirement |
|
Which statement best describes the Equipment Guide List (EGL) |
It is used with a controlling MRC, when the MRC applies to a number of identical items. (All items on an EGL have to be completed for checks to be marked off as completed) EGL cannot exceed 8 hours of work |
|
A ______ is used to provide temporary special instructions or to indicate that unusual action must be exercise to operate equipment. |
Caution tag |
|
A ______ is a four-digit number assigned by the work center to the maintenance action, or assigned by the outside activity performing the work? |
Job sequence number (JSN) |
|
The Standard PMS Identification Guide (SPMIG) consists of ____ categories. |
5 |
|
What is used to assign and monitor the accomplishment of required PMS tasks by work center personnel? |
Weekly PMS schedule |
|
What does the acronym PMS stand for? |
Planned Maintenance System |
|
What does the acronym SPIN stand for? |
Standard PMS Item Name |
|
Which of the following safety precautions apply to death or injury? |
Warning |
|
On the weekly schedule, whose responsibility is it to "X" off the maintenance requirements that have been fully accomplished? |
Work Center Supervisor |
|
Which category of IEM is accomplished on a recurring basis, during the inactive period, to prevent equipment deterioration? |
Periodic Maintenance (PM) |
|
What does SPMIG Category I refer to? |
Test equipment |
|
The maintenance index pages are ..... |
Basic PMS reference document. |
|
What Volume and Chapters of the COMUSFLTFORCOMINST 4790.3 (JFMM) pertain to PMS and MDS? |
Volume VI, Chapter 5 and 19 |
|
ET Division, in Operation Department, owns and performs maintenance on various electrical tools, what division or work center can receive portable electrical tools from the ETs? |
No Division or work center |
|
What instruction dictates the requirements for HAZMAT container labeling? |
OPNAVINST 5109.19 series |
|
The PMS Cycle will be determined at the discretion of the Tour Commander but will not be exceed _____ quarters. |
24 |
|
Who is the ship's 3M manager? |
XO |
|
Who reviews MRCs and promptly submits a PMS TFBR, whenever maintenance requirement are not fully understood and error exist? |
Work Center Supervisor |
|
What is the requirement for repair parts to be listed on an APL? |
List repair parts expected to fail during normal operation |
|
Which PMS schedule, displayed in the work center, displays PMS requirements to be performed during a specific 3-month period? |
Quarterly board |
|
What does the acronym TGL stand for? |
Tag Guide List |
|
______ are prepared and issued for each installed system/equipment for which PMS support had been established |
Maintenance Index Pages |
|
Which of the following provides a listing of all maintenance index page for a workcentre within the 43P1? |
List of Effective Pages (LOEP) |
|
In the "Procedure" block, work center supervisors may line out the non-applicable line items (alternate procedures) that do not pertain to current equipment/configuration when the step is followed with the word "if applicable" or a note identifying the steps to be omitted. These items must be reviewed and initial by the ______ |
Division leading chief petty officer/leading petty officer |
|
As a qualified maintenance person, what do you do upon completion of preventive maintenance? |
Signed the accountability log immediately upon completion of the maintenance action |
|
What is another name for the List of Effective Pages (LOEP)? |
PMS-5 |
|
What is the periodic rate for an MRC which begins with the letter Q? |
Quarterly |
|
If multiple maintenance persons are signed to a single maintenance action who must sign the 13-week accountability log? |
The most senior person assigned |
|
Who will insure that all material deficiencies are properly and promptly documented? |
Department head |
|
The ____ shall independently ensure that the correct component is tag and check (verify) for proper component positioning and tag attachments. |
Second person |
|
What form is used to report the completion of corrective maintenance action or deferred maintenance actions? |
Ships maintenance action form (OPNAV 4790 2K) |
|
What symbol is used to indicate mandatory related maintenance associated with a schedule maintenance requirement? |
Pound sign # |
|
What does SPMIG category II refers to? |
Materials |
|
_____ actions are those conducted to determine that operational conditions of the equipment, its ability to function as designed, and to be integrated with other requirements to form a system. |
Operational test (OT) |
|
What are the categories of preliminary PMS documentation? |
Preliminary MRIs with and without MRCs |
|
which of the following is NOT a category of IEM? |
Mandatory test (MT) |
|
How much maintenance can be listed on an EGL? |
As much as the person can complete in one day (24 hours) |
|
What does SPMIG category IV refers to? |
Tools |
|
What does SPMIG Category III refer to? |
Parts |
|
Who reviews and initials LOEP, MIP and MRC line outs? |
Divisional LCPO |
|
When preparing a quarterly PMS schedule, how are prospective underway dates identified? |
The dates are shaded across the top through the tick marks on the date bar |
|
How are man-hours listed on the MRC card? |
Hours and tenths of hours |
|
What reference requires all priority change or an any updates to the work candidate to be documented and block 35 (remarks)? |
NAVSEAINST 4790.8C |
|
What type of MRCs are printed on pink stock? |
Classified |
|
What is the four segments code used in cataloging MIPs? |
Conventional MIP cataloging |
|
How is "unscheduled" maintenance requirement card (MRC) designated? |
U-1 |
|
The _____ supplements, but does not replace, the technical data found in Material Safety Data Sheets (MSDS). |
NSTM 670 ( hazardous material users guide "HMUG") |
|
What are recurring maintenance action accomplish during an inactive. To prevent equipment deterioration? |
Periodic maintenance (PM) |
|
Who was responsible for the proper performance of the 3M system functions within their respective work center? |
Work center supervisor |
|
What is the focal point for receipt and distribution of Maintenance and material data? |
3M system central database |