• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/66

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

66 Cards in this Set

  • Front
  • Back

What must happen when maintenance is not accomplished?

A check note entry is annotated

A listing of warnings and references which direct attention to possible hazards to personnel which could result in death or injury while doing maintenance are known?

Safety Precautions

What is considered LOST checks?

Daily and Situational checks not accomplished

How many parts are there in the Tag Out Log?

6

What is the primary source data for Maintenance scheduling software?

Navy PMS CD/DVD

Who serves as the overall 3-M Program technical expert and advisor?

3MC

What does the acronym NMR mean?

No Maintenance Required

What must happen when maintenance is not accomplished?

A check note entry is annotated

What type of tag would be used as a precautionary mensure to provide temporary instruction or to indicate that action be exercised to operate equipment?

Caution

Schedule, Review and Forecast does what for the maintenance person?

Saves him time and energy. Help him manage his maintenance

Who has overall responsibility for ensuring ship maintenance is accomplished in accordance with 3M procedures and the 3M system functions effectively?

Commanding officer

who reviews, and approves via signature the Weekly PMS (3 Week Report) Schedule?

Division Officer, wcs and LPO

The LOEP contains all of the following except?

The periodicity code for each maintenance received

which of the following is NOT an example of an IEM maintenance code?

U -1

Equipment is placed in IEM Status I (one) whenever

The equipment will not be operated for7 days or more but fully operational

Which document provides instructions and references required for use in the 3-M System?

OPNAVINST 4710.4

If a question exists regarding a step on a maintenance requirement card (MRC), the maintenance person should.........

Immediately Contact the Work Center Supervisor

What is OPNAVINST 5100.19 Series?

NAVOSH Program Manual for Forced Afloat

How often should PMS check 6641/1005 M-9R be accomplished?

Once a month or as required

Equipment should be placed in IEM Status II when...... ... ...

The equipment is inactive and directly subject to corrective maintenance, overhaul, or removal for safe storage or is temporarily transferred to another activity for 7 days or longer

If an MRC has a SYSCOM CONTROL NO of 11 BWQD Y, what does the Y indicate?

Repair Parts are required

What does a "C" to the Left a MIP on the LOEP indicate?

Changed MIP

A periodically of M-1 signifies what?

M-1 has mandatory related maintenance of R-1

S 24 DWYG N From this(pink) MRC SYSCOM CONTROL Number you know that the MRC is..............

Classified Secret

When a maintenance action(M-1) cannot be accomplished within periodicity, what must be submitted and/or acknowledged reflecting the non- accomplished maintenance?

Check Note and PMS Alert

In OMMS-NG, a Job Sequence Number is created by?

Creating/ submitting a work candidate

When entering a work candidate, formerly a 2- kilo, in OnanMS-NG, what minimum information is required?

Item blocks with a red check by them on each Tab of a work candidate

If multiple maintenance persons are assigned to a single maintenance action, who must update the PMS Schedule and annotate and sign the 13 Week Report?

The Senior Most Person Assigned

A Work Center Supervisor can lend OMMS-NG permissions to someone else without giving them their LAN Password. True or False?

True

To check status of parts ordered for your work center you should

Open your work candidate and check the status on the parts tab

When submitting a 2k in OMMS - NG that is assigned a priority of highly desirable Essential or Mandatory where should the CASREP and serial be documented?

On the MISC tab

What Symbol indicates mandatory related maintenance is required and must be accomplished concurrently for the MR to be 100% Complete?

#

what does the acronym IEM stand for?

Inactive Equipment Maintenance

PMS schedules are produced using what computer program?

SKED 3.2

For a Danger/ Caution tag when does the second person check the tags?

After the first person hangs the tugs and hands the TORS to the second person to find, check breaker/ valve position and signs the tags

What does DLR stand for?

Depot Level Repairable

The RPPO is responsible for maintaining a work center RPPO log. True or False?

True

What is Deferred Maintenance?

Work that need to be done

What is the maximum periodicity range of a 2W MRC?

9 to 19 days

What is the maximum periodicity date range of a 3W MRC?

14 to 28 days

What is the maximum periodicity range of a weekly(W) MRC?

None

What does the WORD CASREP stand for?

Casualty Report

What program onboard is used for HAZMAT Identification?

HMIS

The SPMIG in SKED provide NSN/NIIN numbers for items required by PMS. True or False?

True

What is the basic rule when signing receipts?

Circle, Sign and Date

What does MSDS stand for?

Material Safety Data Sheet

That is GDAPL?

Global Distribution Allowance

A sub category code used to identify test equipment used in the performance of PMS is... ... ...

A Scat Code

The LOEP contains all except which of the following?

Tools Required

The following are responsibilities of the Maintenance Person except............... ...

Ensure the Status of work center planned Maintenance is correctly reflected on the PMS Schedules in SKED

The only modifications which shipboard personnel may NOT make to MRCs are.........

WCS may line out any items in the procedure block

What information goes in the Work Candidate Summary Block in OMMMS-NG?

A brief description of the problem

What are the 5 steps to ORM?

Identify Hazards


Access Hazards


Make Risk Decisions




Supervise

which of the following contains the planned maintenance requirements for a particular work center?

Work Center PMS Manual

When is Asbestos considered a health hazard?

When it is inhaled

What does the acronym TORS stand for?

Tag out record sheet

During the Tag Out procedure, proper component identification ( ie valve label) is required. True or False?

True

The Concept of ORM includes which of the following

A decision making tool used by people at all levels to increase operational effectiveness by anticipating hazards and reducing the risk for loss

Who approves a Force revision. Also approves IEM?

Department Head

What are the responsibilities of the person attaching the Tag?

1. Verify the breaker/valve is in the proper Tag out position.


2. Verify Danger/ caution Tag matches equipment


3. Properly hang Tag

What is the correct for a line item in ESOMS?

WC- 00[Type] DESCRIPTOR

What do you do when you find a damaged Tag?

Notify the Authorizing officer

which of the following is a non- calendar periodicity code?

U-1

which of the following provides detailed procedures for performing maintenance and describes who, what, where, how and with what resources a specific requirement will be accomplished?

Maintenance Requirement card

who maintains the 13 Week Report (Accountability log)?

Work Center Supervisor- wCS

Who is the principal assistant to the XO in 3M matters?

3M Officer