• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/5

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

5 Cards in this Set

  • Front
  • Back

Discuss the concept of ORM

1. Decision making tool


2. Increase operational effectiveness


3. Identifies and manages risk

Of the five steps of ORM discuss Implementing controls

1. Engineering-change design or material selection


2. Administrative-making warning signs, develop SOPs, etc.


3. Physical Control- PPE, Barriers, etc.

Discuss the purpose of the tag out procedure.

Provide for personnel and ship safety and prevent damage of equipment.


Electrically and mechanically isolate systems/equipment to complete work safely


Provides standard Tag-out procedures.

Identify and explain the Two types of tag out procedures

Caution and danger.


Caution yellow- used to amplify instructions on how to operate equipment


Danger Red- used to mechanically or electrically isolate a system to conduct corrective maintenance or preventative maintenance.

What are the two types of danger red maintenance?

Corrective- tags may be hung until no longer needed.


Preventive maintenance- tags must be cleared within 24 hrs or eod.